论文部分内容阅读
In China the first groundwater recharge demonstration plant with reclaimed municipal wastewater was setup and devoted to operation in 2002 with a capacity of 500 m3/d in Beijing Gaobeidian WWTP.This paper summarized the results and experiences of one year period operation.The aquifer treatment contributed 40% removal of the bulk organics in terms of DOC,COD,and UV254 absorbance.The recovered water quality meets requirements of non-potable purposes.