介绍了宁德核电站1号机组工程概况,着重介绍防甩击大梁的制作过程和难点,以及制作时采取的工艺措施。从现场构件安装看,该工艺方案和措施达到了控制精度的目的,从而满足了设计要求。
The general situation of Unit 1 in Ningde Nuclear Power Station is introduced. The manufacturing process and difficulty of anti - whipping girder are introduced emphatically, as well as the technical measures taken in the production. From the point of view of the installation of the on-site components, the process scheme and measures have achieved the purpose of controlling the precision so as to meet the design requirements.