The New St.Lorenzo al Mare-Andora Railway Connectionthe Design and Construction of Two 345m2 Junctio

来源 :第四届中国国际隧道工程研讨会 | 被引量 : 0次 | 上传用户:iczfjh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The main railway tunnel hosts two 107m long junction caverns within the area of the Imperia Station.The first is located at a distance of 100m from the Imperia portal site.The caverns have a 25.9m span and cross-sectional areas of 345m2.They are connected to each other by a three-track,non-symmetrical tunnel section.A single track tunnel also lies along the first cavern.The tunnels have been excavated in flyschs of fair rock mass quality and have overburdens of about 130m.The design of the excavation sequence,the support measures and the dimensioning of the lining system were based on numerical modelling.The support system consists of heavy steel sets that are connected to the rock mass by 8m-long swellex bolts and 30cm of shotcrete.Fibreglass bolts were used to pre-reinforce overstressed zones and as forepoling in the tunnel crown area.Excavation proceeded according to a top-heading and bench scheme.Invert excavation and casting the lining is currently under progress.
其他文献
本文为直观了解大型跨江海盾构隧道联络通道施工对工程的整体影响,采用三维数值模拟方法,对南京长江隧道联络通道的动态施工过程进行仿真分析,重点研究了联络通道衬砌厚度对
本文阐述了人民路隧道工程在复杂环境和特殊地质条件下,为确保大型泥水平衡盾构泥水处理系统能安全、经济、高效地满足盾构施工需要而研究制定的各种技术措施,分析了MS泥水处
本文介绍了通过对沈阳地铁2号线奥—会区间土压平衡盾构机始发所遇问题及处理,分析了盾构机被困原因,并提出了有效的处理和预防措施.
本文介绍了长江隧道工程泥水系统采用两套法国MS泥水处理系统,研究人员在消化吸收的基础上对集成式模块化泥水处理方案进行了优化设计.方案中的电气系统设计包括电气图纸设计
本文介绍了国内外盾构设备及其工作要求,详细介绍了盾构液压油的发展现状和高洁净度抗磨液压油的研制过程及应用情况,通过研究和理化性能评价以及实际使用,认为目前国产高洁
本文介绍重庆轨道交通3号线地下区间近距离上跨病害隧道设计.菜园坝大桥至牛角沱地下区间距原有病害隧道很近,在设计施工中,对单跨跨越、管梁跨越、门式框架跨越等多种方案对
本文介绍了在杭州地区粉砂、粉土地层,地下水丰富的情况下,通过对盾构机进、出洞端头地层实施深层搅拌桩与高压旋喷桩施工,并布设降水井降低地下水位,提高破除围护结构后洞门
本文通过对盾构挖掘机刀盘驱动器使用的齿轮油进行全面性能分析研究,提出了增加抗磨极压剂的方法,解决了刀盘驱动器扭矩波动和齿轮油箱中油温升高问题;深入分析了不同抗磨剂对
Traces of asbestos-bearing rocks were encountered just before the completion of the excavation of the Cesana tunnel.The type of mineralization is that of amphib
The construction of Kent Ridge Station of Contract 855 of Circle Line Project in Singapore adopted a standard cut and cover method using contiguous bored piles