Evaluation of Seismic Risk for Bridges using F-R-M MethodA Combination of Finite Element Method and

来源 :2016年交通基础设施和材料国际会议 | 被引量 : 0次 | 上传用户:hanjingcj520
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Earthquake action in the design of the bridge belongs to the accidental action.Earthquake is difficult to predict,so the frequency of its occurrence is very small when the structure is in use.Once it occurs,the seismic value is very large and destructive,therefore the risk assessment of the damage caused by the earthquake to the bridge structure becomes the main problem of bridge engineering design.Our country is an earthquake-prone area,and bridges built there have relatively large adjacent spans,of which the quality and stiffness distribution is uneven,due to the limitation of terrain and construction conditions.The existing seismic codes are not applicable to the seismic risk assessment method of the bridge; therefore,it is very important and meaningful to study the seismic risk assessment method.In this paper,a new method for estimating seismic risk probability of bridge seismic risk in earthquake-prone area,which is a combination of neural network simulation and probabilistic finite element method(F-R-M)is established.In the method,firstly,the multiple seismic wave of bridge history analysis and get corresponding seismic response to the structure of the bridge,then RBF neural network is established,with numerical field type,seismic wave energy,seismic wave peak number,the pier moment as input parameters,to train and test the network of RBF.After the success of the training,the Monte Carlo method can be adopted to generate a large number of random numbers with the simulation of neural network to get bridge structures data subjected to random seismic response,and the structure failure probability can be calculated.
其他文献
  At present,the studies of regional integrated transport corridor mainly focus on the planning and construction of transport corridor.Fewer studies investiga
会议
  In the design phase of highway engineering introduced the theory of total life cycle cost analysis,Choose reasonable pavement structure scheme and formulate
  In order to determine the impact of vehicle-bicycle conflict on the capacity,this interference on the capacity are divided into three states: no interferenc
  To develop a low-carbon construction model for bituminous pavement construction,this study divides the fieldwork construction of bituminous pavement into ag
冻胀、积冰会给隧道造成巨大压力,改变隧道的应力环境,危及隧道的稳定性与安全性,是寒区隧道常见的冻害.为了防止冻胀、积冰冻害的发生,隧道施工时,须在初期支护与二期衬砌之
  In order to make thin layer paving one-step shaping during polymer concrete pavement construction,the relationship model between vibration parameters,struct
2012年哈大高速铁路发生冻胀现象后,一系列路基冻胀的监测研究工作被相继开展.本文在整理分析大量实测数据基础上,分别从宏观和微观方面出发,多角度地总结提炼了路基冻胀发生
本文依托寒区高速铁路——哈大客运专线运粮河特大桥工程实例,利用大型有限元软件Midas/civil建立数值仿真模型,详细模拟了桥梁各施工阶段,根据后期变形最大的原则确定箱梁徐
  Pavements are one of the major contributors to the urban heat island(UHI)effect of cities because they cover a considerably large fraction of urban ground s
会议
  Accurate assessment of effort,time and resources for estimation of project cost is a challenging task for project managers.Several methodologies are commonl
会议