ICTIM2016 PaperDiamond grinding or grooving a concrete pavement Achieving the 4Ss in the 21st Centur

来源 :2016年交通基础设施和材料国际会议 | 被引量 : 0次 | 上传用户:abcd432110000
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Diamond grinding/grooving(DGAG)of concrete pavement is undertaken for a number of different purposes include improve ride(smoothness),increase skid resistance,quieter pavements(silent)and for concrete road revival(sustainability).This technique was first used in 1965 on a 19 year of section of I-10 in Southern California to eliminate excessive faulting.Since then,diamond grinding has become a major element of concrete pavement restoration project in the USA.DGAG was introduced in Australia in the early 21st century.The Company has undertaken diamond grinding/grooving assignments in Australia for the past four years.These assignments were undertaken on new concrete pavements,existing concrete pavements and existing concrete pavement with asphalt overlay removed in New South Wales,Australia.The outcomes of these years of experience shows that the DGAG process is a cost effective process in achieving 4Ss.This paper presents a brief description of some of the DGAG assignment conducted and a summary of the findings.
其他文献
  To avoid the potential risk of collision between pedestrians and ego-vehicle,we propose a new pedestrian detection algorithm based on multi-layer LIDAR.Firs
会议
  Traffic stream of developing countries have a characteristic heterogeneous traffic stream moving in a weak or no lane-discipline.Due to these reasons,state-
会议
  With the rapid development of information technology,there is an increasing interest in connected vehicle and related technology.Compared to the large numbe
会议
  Current design methods propose that reinforcement loads distribution within reinforced soil slope is affected by slope height instead of slope inclination,w
会议
  Highways,railways,airport runways and levees(dikes)consist of multiple structural layers which ultimately rest on an earthen subgrade.Over time,erosion,near
会议
  The important effect of cave span,roof thickness and strength on the stability of cavern has been widely recognized,while the influence of geostress on the
会议
  In order to cure asphalt pavement distresses caused by expansive soil subgrade,a new maintenance technology based on trenchless technology with the macromol
会议
  Five scaled model tests of reinforced foundation with different reinforcement length and depth(layer numbers)as well as one contrast test of unreinforced fo
会议
  The need of cement stabilized crushed rock was introduced in the situation that the road roller cant vibrate in the rural areas through the construction of
  Ultra high performance concrete(UHPC)is a new type of cement based composites with high strength and excellent durability.Firstly,this paper introduces the
会议