一、平朔矿区采暖状况及集中供热的必要性(略) 二、集中供热工程优化设计主要内容平朔矿区集中供热工程结合矿区总体规划,以及近期的供热负荷,在合理的供热半径范围内,共分为以下三个单项工程。 1.平朔矿区安太堡集中供热工程矸石电厂供热。以矸石电厂40t/h 供热蒸汽做为热源,以安太堡露天矿及选煤厂(部
I. Heating Status and Necessity of Central Heating in Pingshuo Mining Area (omitted) II. Optimization Design of Centralized Heating Projects Key Contents of the Central Heating Project in Pingshuo Mining Area Combined with the overall planning of the mining area and the recent heating load, reasonable supply Within the scope of thermal radius, it is divided into the following three single projects. 1. Anpingbao District, Pingshuo Mining District, Central Heating Project, Lanzhou Power Plant, heating. 40t/h heating steam as heat source in Yanshi Power Plant and Antaibao open-pit mine and coal preparation plant