Vehicle Attitude Control Using Finite Time Convergence Incremental Nonlinear Dynamic Inversion Combi

来源 :2014中国制导、导航与控制学术会议 | 被引量 : 0次 | 上传用户:illuminate
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper presents a finite time convergence incremental nonlinear dynamic inversion combined the command differential signals feed forward control.It shows better performance in handling command signals racking problems caused by the time delay of angular acceleration feedback signalsacquisition in regular incremental nonlinear dynamic inversion,with the combination of finite time convergence desired outputs and command differential signals.The status tracking error convergence theorem for finite time convergence incremental nonlinear dynamic inversion is proved,together with model mismatch perturbation analysis.Simulation results demonstrate,the method presented in this paper not only shows insensitive to model mismatch as the regular incremental nonlinear dynamic inversion,but also tracks the command signal without error in real time.
其他文献
To improve the BDS positioning precision,the model of the BDS static positioning errors is presented by using time series analysis.The error series is verified
会议
重视和关注人民群众的获得感、幸福感、安全感是我们党“以人民为中心”根本立场的具体体现.文章聚焦新型城镇化过程中新市民的主观幸福感,探讨公共图书馆提供的社会支持对新
枣树新害虫樗蚕的发生与防治张立震,曲炳国,胡国敦(沧州市农林局)(南皮县林业局)樗蚕PhilosamiacynthiawalkeretFelder属鳞翅目,大蚕蛾科,又名乌桕樗蚕蛾。近年在冀东南枣区普遍发生,为害严重。据资料记载,樗蚕主要分布
财政加强基建投资预算管理的必要性舒大辉,曹健琴基本建设是一项特殊的经济活动.它对现实经济产生巨大需求效应的同时.又对未来经济产生投资的供给效应,它是连接现实经济与未来经
Microburst wind shear,which is a special type of atmospheric phenomena,has been widely investigated for the interference it would bring to the aircraft navigati
会议
In order to solve the problem of moving target detection caused by the ineffective calculation of the optical flow and the insufficient background compensation,
会议
俄罗斯投资危机表现为以下几点:1)投资额连年下降;2)投资结构向非生产性倾斜的同时,生产性投资又向原料能源部门倾斜;3)固定资产损耗严重;4)外国投资少,国内资金却大量外流。
文章以美国图书馆协会2006-2018年发布的数据相关的招聘广告为数据来源,共收集了职位名称中包含“Data”的321个招聘广告,对具体的职位名称、知识和技能要求以及职能职责进行
前言 在隧道工程中,能否搞清周围泉水涌水量的变化原因?本研究报告以此为出发点,仅从降水的原因和涌水的结果着眼,试把泾流结构当成暗箱考虑,把降水和涌水两者的关系用输入
利用十万分之一或五万分之一的地形图来求小桥涵汇水面积,确可节省大量实测的人力。过去,关于这方面的介绍不多,希望已采用的地区,将新的经验或心得写给本刊,特别是所测的线