营业铁路上线路改建与新线铁路建设有所不同,主要在保证运输畅通、少影响运输、甚至不影响运输的情况下进行施工,因此,过渡方案的选择,是营业线路改建施工的重要环节之一。营业铁路的线路施工中,几乎大部份工程需要施工过渡。如在新建线路铺轨工序完成后,铺设工程道岔,以便进工程列车卸砂石料,需要施工过渡;在运行线路上对既有线路平面及纵断面进行改造,因工期较长,需要修筑施工便线过渡;在新车站建成后,代替既有车站,投产使用时,为了少影响运输,不仅线路需要施工过渡,而且电务配套也需要施工过渡。
The alteration of the line on the commercial railway is different from the construction of the new railway. The construction is mainly carried out with the guarantee of unimpeded transportation and less impact on the transportation even without affecting the transportation. Therefore, the choice of the transitional plan is an important part of the reconstruction of the business route one. In the construction of railway lines, almost most of the projects require construction transition. For example, after the completion of the laying of new lines, laying of engineering turnouts so as to facilitate the entry of unmanufactured stones into the engineering trains requires the construction transition; the reconstruction of plane and longitudinal sections of the existing lines on the running lines requires the construction of the construction line After the completion of the new station, in place of the existing station, put into operation, in order to minimize the impact of transport, not only the construction of the transition line needs, but also supporting the construction of electrical services transition.