论文部分内容阅读
This paper introduced the tunnel of Shanghai World Expo power tunnel under-passing the tunnels of metro line 1 which kept running during the construction of under-passing.Based on the experience of similar engineering and former work, determination of construction parameters including earth chamber pressure, amount of injecting and shield driving speed were discussed.