激发极化衰减信息与水量的正相关关系为水量的定量估算提供了理论基础,为不良地质体中充填水量的足量估算提供可行途径,前向三维激发极化适用于TBM环境,为TBM施工提供了可用的超
【出 处】
:
The 6th China-Japan Workshop on Tunneling Safety & Risk(CJTS
论文部分内容阅读
激发极化衰减信息与水量的正相关关系为水量的定量估算提供了理论基础,为不良地质体中充填水量的足量估算提供可行途径,前向三维激发极化适用于TBM环境,为TBM施工提供了可用的超前地质预报方法,联合反演被在降低多解性方面有较好效果。
其他文献
OutlineⅠ.Introduction Ⅱ.Glueballson the lattice Ⅲ.XYZ particles on the lattice Ⅳ SummaryⅠ.Introduction1.The lattice rormulation of QCD---Lattice QCD
Outline:1.Introduction 2.Penta-quark states with strangeness 3.From Strangeness to charm & beauty 4.Conclusions1.Introduction Spectroscopy → interaction dynam
Hadrons:normal & exotic Quark model:hadrons are composed from 2(meson) quarks or 3(baryon) quarks QCD does not forbid hadrons with Nquarks 2,3-Glueball:Nquarks
1.Introduction Difference in design and results…… 1.Introduction We should reduce these risks to perform rational tunnel construction,Effective survey and mea
Outline LHCb experiment Highlights of results on CP & rare decays Bc studies J/ψ production at 13 TeV Observation of Pentaquark states Conclusions
注浆压力的大小会影响围岩裂隙通道的形成,当注浆压力达到劈裂注浆前为渗透注浆,不会有新的裂隙生成,浆液的扩散半径较小,围岩抗渗透的能力并没有得到较好的改善;当注浆压力达到
Najio Road Hachiman Tunnel Construction Site Shioze-cho Najio,Nishinomiya-city,Hyogo Prefecture Ordering party Ministry of Land,Infrastructure,Transport and Tou
Content 1 Definition of the shallow tunnelling method(STM),2 Insights into the STM,3 Cases of subway station construction using STM,4 Numerical simulations of d
Contents 1.Infrastructure Survey by using ICT,2.MIMM-R 2.1 Outline of MIMM-R 2.2 High-precision Topographical Surveys 2.2 Laser tunnel Survey Method 2.3 Tunnel
Contents Uncertainties in tunneling,Probabilistic geology prediction,Probabilistic cost estimation,Prospect of probabilistic design.Ⅰ.Uncertainties in tunnelin