针对6KV两回路经井下变电所集中供电存在的问题,介绍改造后的环形供电方式在井下供电运行中的实际效果。
In view of the problems existing in the centralized power supply of 6KV two loops via underground transformer substation, the actual effect of the modified circular power supply mode in underground power supply operation is introduced.