A new organization and management mechanism with the local government as the main body was created during the post-disaster reconstruction of the "4. 20 " Lusha
By using the digital observations of the pendulum tiltmeter, water tube tiltmeter,extensometer and volumetric strainmeter at Huzhou station and with the power s