论文部分内容阅读
民航总局为华北局配置的全固态航路监视雷达及雷达终端系统经空管局及外国工程技术人员一年来的土建、安装、调试于不久前通过了初步现场验收,设备的主要技术指标基本达到了合同规定的要求。
The civil solid-route monitoring radar and radar terminal system configured by CAAC for the North China Bureau passed the initial on-site inspection and acceptance recently by the Air Traffic Control Administration and foreign engineering and technical personnel over the past year. The main technical indicators of the equipment have basically reached Contract requirements.