2017年10月17日,由水电水利规划设计总院(可再生能源定额站)承担的《建筑业营改增对水电工程增值税返还政策的影响研究》课题通过中国长江三峡集团公司审查。会议认为,本课题研究目标明确、思路清晰、方法运用得当,研究成果依据充分、结构合理、内容丰富充实,完成了合同规定的研究任务,达到了预期目标。2016年11月,课题研究任务合同签订。可再生能源定额站针对本课题研究任务和目标,在自立课题《建筑业“营改增”后水电建筑安装工程计价依据调整方案研究》的基础上,结合水电工程特点,考虑增值税简易计税办法、增值税一般计税
On October 17, 2017, the subject of “Study on the Impact of Construction Business Increase on the VAT Return Policy of Hydropower Projects” undertaken by the Hydropower Planning and Design Institute (Renewable Energy Station) was examined by China Three Gorges Corporation. The meeting held that the objectives of this project are clear, the thinking is clear, the methods are used properly, the research results are fully based, the structure is reasonable, the content is rich and substantial, and the research tasks stipulated in the contract are completed and the expected target is achieved. In November 2016, the research task contract was signed. In view of the task and goal of this research project, on the basis of the self-reliance project “Construction Industry”, “Based on the adjustment plan research of hydropower construction and installation engineering pricing”, combined with the characteristics of hydropower project, consider the simple value-added tax Tax methods, general VAT tax