严密组织施工 确保工程质量

来源 :施工企业管理 | 被引量 : 0次 | 上传用户:sdngam
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
秦北庄330千伏输电工程是秦岭电广的送出工程,是西北电网东电西送的主干线,是为配合龙羊峡水电站蓄水而建设的骨干工程。线路东起秦岭电厂,经西安北郊,西至兴平庄头变电站,途经华阴、华县、渭南、临潼、高陵、西安、咸阳、兴平等六县两市。全长160.8公里,杆塔471基。线路由西北电力设计院负责设计,工程设计概算为2327.6万元。该工程于1985年11月5日 Qin Beizhuang 330kV transmission project is the project of transmission of Qinling-Lanzhou-Electrical-Guangxi. It is the main line of the Northwest Power Grid sent from east to west and it is a backbone project built to support the storage of Longyangxia Hydropower Station. The line runs from the Qinling Power Plant in the east to the Xingping Zhuangtou Substation in the west of Xi’an and passes through Huayin, Huaxian, Weinan, Linyi, Gaoling, Xi’an, Xianyang and Xingping six counties and two cities. The total length of 160.8 kilometers, 471 base tower. The line is designed by the Northwest Electric Power Design Institute, and the project design estimate is 23.266 million yuan. The project was completed on November 5, 1985
其他文献
党中央、国务院制定的“八五”计划和十年规划纲要,提出了要积极发展建筑业,使之逐步成为重要支柱产业的要求,这也是我们建筑业的奋斗目标。积极发展建筑业,需要进行多方面
建筑企业从改革起步的八十年代初期开始,在生产工人中普遍恢复了计件工资制。实行计件工资,“按劳动者完成的合格产品数量或作业数量及规定的计件单价来支付劳动报酬”,打破
1991年是国家在全国范围内开展的“质量、品种、效益年”,劳动研究会,要进一步树立为基层服务,为企业服务的思想,从提高企业的素质和效益出发,努力作好以下工作:(一)继续组
加强企业内部分配调控,建立和完善自我约束机制,是计划经济与市场调节结合的管理体制的客观要求,是治理整顿,深化改革的重要措施,也是国家对企业由直接管理转向间接管理后,
努力提高经济效益,是深化企业改革的根本标志,那么,内部审计监督,应如何促进企业搞活,帮助企业提高经济效益,实现扭亏增盈?邯郸地区建筑工程总公司,为了帮助所属四个公司改
今年是实现十年规划和“八五”计划的第一年。千里之行,始于足下。我们这次建设系统审计工作会议在这样的时候召开,应当说时机是非常恰当的。这次会议的任务,就是要以党的十
东煤公司一九九一年科技工作会议于1991年6月9~11日在哈尔滨市友谊宫隆重召开。东煤公司所属二级公司(局)、矿务局(指挥部)、大专院校、科研单位主管科技工作的局长、总工、
重庆国营建设机床厂为提高摩托车生产的外观质量,贯彻“高起点、大批量、专业化”的技术政策,在较短的时间内依靠工厂自己的技术力量完成了引进喷漆生产作业线的安装调试和运
县、乡建筑经济联合体企业起源于八十年代初起步的建筑民兵师(团)。1985年,国家对建筑企业进行资质审查时,由于乡镇建筑队伍基础条件差,技术力量薄弱,资金不足,装备率低,影
马羊交年,是实行承包经营责任制的大多数施工企业第一轮承包到期,第二轮承包开始的交替时期。根据《企业法》和国务院(1990)33号文件《在治理整顿中深化企业改革,强化企业管