河南省水利勘测总队承担的南水北调中线工程总干渠沙河南至漳河南渠段的初步设计阶段工程勘察工作,在广大勘测工作者的艰苦奋战下,运用先进的勘测技术和方法,较好地完成了上级下达的各项勘测任务,勘测成果先后通过省厅、长江委及水利部验收,均达到国内先进水平。一、工程概况南水北调中线工程总干渠是跨世纪跨流域的特大型引水工程,经河南、河北输水至京、津地区,全
Henan Province Water Conservancy Survey Corps assumed the South-to-North Water Diversion Project main canal Shahe Nanzhang to Zhanghe Nanqu Drainage section of the preliminary design phase of engineering exploration work in the vast number of surveyors work hard, the use of advanced survey techniques and methods to better complete All survey tasks issued by superiors, the survey results have passed the provincial hall, the Yangtze River Commission and the Ministry of Water Resources acceptance, have reached the domestic advanced level. I. Project Overview The main canal of the Middle Route of the South-to-North Water Diversion Project is a large-scale water diversion project across the river basin in the past century. It transports water to Beijing and Tianjin areas through Henan and Hebei