重水零功率堆顶部屏蔽的设计

来源 :中国原子能科学研究院年报 | 被引量 : 0次 | 上传用户:west_fox
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
重水零功率堆顶部屏蔽的设计经过两个阶段的分析比较,得出了比较合理和现实可行的设计方案。第一阶段分析,采用经验或半经验的辐射穿透计算和散射计算,并在原有实验大厅屋顶厚度和材料不太确切的情况下,假设大厅屋顶为40cm混凝土进行辐射屏蔽计算,根据计算确定在堆芯顶部采用加硼石蜡外套钢板的复合屏蔽体,其重量只受限于大厅吊 The design of the top shield of zero-power reactor for heavy water has been analyzed and compared in two stages, and a more reasonable and realistic design proposal has been obtained. In the first stage of analysis, empirical or semi-empirical calculations of radiation penetration and scattering are used. If the thickness and material of the roof of the original experimental hall are not accurate enough, the ceiling of the hall is assumed to be 40cm of concrete for radiation shielding calculation. Based on the calculation, The core of the top with boron paraffin wax coated steel shield, its weight is limited only by the hall
其他文献
乌克兰燃料与动力部副部长努·尼格马图林宣布,乌克兰“原子能”国家原子能应用公司、俄罗斯“ТВЭЛ”公司与哈萨克斯坦的“哈萨克原子工业”公司于2001年7月签订了“关
The reactive wetting kinetics of a Sn-30Bi-0.5Cu Pb-free solder alloy on a Cu substrate was investigated by the sessile drop method from 493 to 623 K.The triple
我们设计与制作的快堆模型于1990年12月全部完成,并参加了首届全国军转民高技术出口产品展览和国家高技术能源领域汇报展览。该模型由三部分组成:实验快堆厂区平面布置1:150
不锈钢(1Cr18Ni9Ti)及其焊接样品、碳钢、铝等典型工程材料试样自1988年6月投入秦山核电厂现场大气腐蚀试验后,1989年全年对现场大气环境的温度、湿度等进行大量的、完整的
差异化的信息披露是证券市场公平与效率的体现,有助于全面保护投资者利益,降低上市公司信息披露成本,增加监管的针对性。上市公司质量是信息披露差异化的衡量标准,上市公司信
2012年11月9日,青岛华东工程机械有限公司制作的首台国产化200T/600T.M全液压操作机在烟台台海顺利投产,交付业主使用。这是华东机械继2011年10月浙江德润120T/360T.M全液压
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
在FFBR的概念设计阶段,作了芯部燃料管理的初步分析,描述了从初装堆芯到平衡芯部的换料方案。FFBR从初始芯部到平衡芯部的过渡用了1DX、2DB和FUMA程序,采用了分区、 In the
快堆中,由于燃料组件内棒束排列紧凑,包壳内、外表面的周向温度变化较大。在棒束内,燃料棒偏离对称位置的时候更为明显。这种周向温度变化会引起燃料棒热弯曲,热点温度进一
本课题于11月在沈阳市通过了七五科技攻关项目的鉴定,软件包分为:(1)稳态强油导向冷却变压器的温度分布计算;(2)瞬时短路及停风停泵事故状态下线圈的温升计算;(3)自然循环变