1 总体规划和建设目标1.1 设计和运行要求 引黄济青工程在设计中采用了美国加州北水南调工程中实施的“控制容量”理论,该理论的要点就是在输水过程中同时控制全线闸门开启度,使之在流量变化时,河槽中水容量变化值趋向最小值。鉴于引黄济青工程中间无调蓄水库、四级泵站串联运行、输水期间水量波动及骤变的情况时有发生,为此,实现“控制容量”调度运行的前提是配备一套完整的通信设施和自动化控制系统,以体现以下功能:
1 Overall Planning and Construction Goals 1.1 Design and Operational Requirements The project “Control Capacity” implemented in the design of North Yellow River diversion project in California, USA, is used in the Yellow River Diversion Project. The key point of this theory is to control the full opening of the floodgates Degrees, so that when the flow changes, the water volume changes in the channel tends to the minimum value. In view of the Yellow River Freezing Intermediate Project no intermediate storage reservoir, four pumping stations in series operation, during the water fluctuations and sudden changes in water occur from time to time, to achieve “control capacity” scheduling operation premise is equipped with a complete set of communications Facilities and automation control system to reflect the following functions: