论文部分内容阅读
以青藏铁路安多铺架综合基地为例,介绍了铺轨基地的设计原则,布局规划原则以及计算要点,并指出了高原铺架基地施工时应注意的事项。
Taking the Anduo Comprehensive Base of Qinghai-Tibet Railway as an example, the design principle, layout planning principle and calculation points of the laying base are introduced. Attention should also be paid to the matters needing attention in the construction of plateau laying base.