论文部分内容阅读
工程成本分为施工直接成本和施工间接成本两部分;前者在施工总成本中占有最大的比重。FIDIC 条款下的国际工程必须采取竞标方式,在国际工程承包市场竞争日趋激烈的形势下,要想在国际竞标工程中中标并获得预期的利润,承包商就必须对工程施工成本的各组成部分作出深入细致的分析并进行有效的控制。施工成本控制得好坏是承包商以技术水平和经营管理能力为代表的竞争力的集中体现,承包商必须对每项的成本支出作出周密的分析、预算和控制;及时准确地采集、传递、分析和处理多种成本信息并采取相应的对策,需要大量和高素质的人员及完备的信息管理系统。为此,承包商必须予以高度重视和认真对待,并给予足够的投入。
The project cost is divided into two parts: the direct cost of construction and the indirect cost of construction; the former occupies the largest proportion in the total construction cost. International projects under the FIDIC clauses must be bidding. Under the increasingly fierce competition in the international engineering contracting market, in order to win the bidding and obtain the expected profits in the international bidding projects, the contractor must make the various components of the construction cost In-depth and detailed analysis and effective control. Construction cost control is good or bad contractor to the technical level and management capabilities as the representative of the competitiveness of the concentrated expression, the contractor must make careful analysis of each cost, budget and control; timely and accurate collection, transmission, Analysis and processing of various cost information and take corresponding measures, requires a large number of high-quality personnel and a complete information management system. To this end, the contractor must attach great importance and take seriously and give sufficient input.