论文部分内容阅读
江西省奉新县仰山三级水电站,工作水头195m,装有2台HL90-WJ-84型水轮发电机组,装机容量2×2500kW,机组转速1000r/min。自1986年10月投入运行
Fengxin County, Jiangxi Province Yangshan III Hydropower Station, working head 195m, equipped with two HL90-WJ-84 turbine generator installed capacity of 2 × 2500kW, unit speed 1000r / min. Since 1986 October put into operation