论文部分内容阅读
历年来,农田水利“最后一公里”工程由于规模小、数量多、分布广和技术含量低等因素,在建设规划方面得不到足够的重视。在禹州市,因水资源总量和分布不均的制约、实施建设部门不同、水资源不能合理利用等原因,造成工程闲置、建设标准不一、项目重叠安排、漏村空项、水资源过度开发等,不利于农田水利基础设施建管长效机制的发展,特别是我省粮食生产实现“九连增”后,在实现农田水利建设和粮食增产目标的攻坚阶段,如不引起足够的重视将成为影响我省粮食增产的主要因素之一。
Over the years, farmland water conservancy “last mile ” project due to the small size, large number of widely distributed and low-tech and other factors, not enough attention in the construction planning. In Yuzhou City, due to the restriction of the total amount and distribution of water resources, the implementation of different construction departments, the rational utilization of water resources and other reasons, resulting in unused construction projects, different construction standards, project overlapping arrangements, missing village empty items, water resources Over-development, etc., is not conducive to the development of long-term mechanism for the construction of irrigation and water conservancy infrastructure, especially after the grain production in our province has achieved “9 Lianzeng”, and in the crucial stage of achieving the goal of farmland water conservancy construction and grain production increase, Sufficient attention will be one of the main factors affecting the grain yield in our province.