四川省交通厅公路工程局第六工程处,是1965年初成立的新处,有93%的工人是从农村来的亦工亦农合同工人。干部中有40%是从工人中临时指定当干部的,其余也是从各单位调来的,业务生疏,缺乏经验。1965年1月,该处接受了紧急施工任务,因为筹备仓促,许多准备工作来不及做,勘测设计跟不上,几千工人一下涌入工地,衣食住行都发生了严重的困难。工程任务也很艰巨,海拔高,气候严寒,风沙大,冬春黄尘滚滚,夏秋阴雨绵绵,自然条件很差。
The Sixth Agency of Highway Engineering Bureau of Sichuan Communications Department was a new office established in early 1965. 93% of the workers were contracted workers from rural areas. Forty percent of cadres are appointed temporarily as cadres among workers, and the rest are transferred from various units with unfamiliar business and lack of experience. In January 1965, the department accepted the urgent construction task because of the rush to prepare, too many preparatory work was too late to do and the surveying and design could not keep up. As thousands of workers swarmed into the construction site, serious difficulties occurred in the basic necessities of life. Engineering tasks are also arduous, high altitude, cold climate, wind and sand, rolling in winter and spring dust, rainy summer and autumn, poor natural conditions.