由于核电站的修建步伐不断加快,最近15a来,俄罗斯已停建抽水蓄能电站工程,这就导致其电力系统不能保持平衡。为了解决这一问题,莫斯科州水工建筑物设计院建议修建既有核电站,又有抽水蓄能电站的库尔斯克综合性电力工程。对俄罗斯电力工程建设现状以及库尔斯克综合性电力工程的坝址、设计和机组布置方案等作了简要介绍。
Due to the accelerating pace of construction of nuclear power stations, Russia has stopped construction of pumped-storage power stations in the recent 15 years, resulting in a balance between its power systems. In order to solve this problem, Moscow State Hydraulic Design Institute proposed the construction of a complex Kursk power plant that has both nuclear and pumped storage power stations. The current situation of power engineering construction in Russia and the dam site, design and unit arrangement of Kursk comprehensive power engineering are briefly introduced.