四显示自动闭塞改造工程按三显示自动闭塞配套开通的过渡方法

来源 :铁路通信信号工程技术 | 被引量 : 0次 | 上传用户:a98466
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
现行设计方案采用四显示移频自动闭塞。因区间改造只能按区段一次开通,站场改造又先于区间改造,本着最大限度减少对运输影响的原则,避免二次大封锁,制定的施工过渡方案为软件不变,即站内仍按区间四显示设计一步到位(包括计算机联锁软件),只改硬件(即接口、信号机点灯电路),这样既减少了施工封锁次数,又满足了运输生产的需要。 The current design uses four display frequency shift automatic blocking. Due to the range of transformation can only be opened once by the section, station transformation and transformation of the first section, in line with the principle of minimizing the impact on transport, to avoid a second blockade, the construction of the transition plan for the software unchanged, that station still According to the interval four shows the design step (including computer interlocking software), only to hardware (interface, signal lighting circuit), so that not only reduces the construction blockade, but also to meet the needs of transport production.
其他文献
在CTCS-2级和CTCS-3级列控车载设备中,司机通过观察和操作人机界面DMI(Driver-Machine Interface)单元监控和调整列车运行状态,但是司机的错误操作、DMI设备故障等均可能导致列
“雪落着……”/ 美丽的静默,/冷冻成一座雕像。/ 目光摔倒在路上。/心说:/那里梅花开了。” 这是印在《诗神与爱神》背面的一首诗,题目为《远山》。它很美,但是“目光摔倒在
德国Krombacher啤酒公司目前已开始采用Scholler Arca系统公司提供的在提手引入了热塑性弹性体(TPE)的新一代周转箱,啤酒周转箱采用软触摸搬运提手后会使搬运工感到舒适。
本文是以上海联合包装装潢有限公司使用ERP系统作为案例,详细阐述了联合包装五年来使用ERP系统进行精细化管理后的经验体会。
2009年杭州市“十大工程”重点项目——亚洲包装中心首批入园企业浙江绿成包装集团年产2亿平方米新型纸包装材料项目,经过2年的筹备,于2009年9月9日在杭州钱江经济开发区竣工投
进入21世纪,以仿造性、快速化、平民化为主要特征的"山寨产品"充斥市场,对社会经济带来巨大冲击。文章从工业设计的角度审视"山寨"这一新文化现象,努力反思其所根植的社会土壤,指
介绍武广高速铁路移动通信公网的建设及通信效果,给乘客提供通信无缝连接、优质、可靠的通信服务,并希望对其他铁路工程建设有所参考。目前,高速铁路专网GSM—R移动通信系统为了
期刊
2007年9月23日上午10时,浙江景兴纸业股份有限公司年产45万吨包装纸项目竣工投产仪式暨60万吨包装纸板项目开工仪式在平湖市景兴造纸工业园隆重举行。嘉兴市委副书记朱伟,平湖
据报道,日前,浙江省平湖市独山港区管委会和台湾荣成纸业股份有限公司举行合作项目签约仪式,总投资2.97亿美元的高强度瓦楞纸项目正式落户平湖。