论文部分内容阅读
目前我国第二大抽水蓄能电站——十三陵抽水蓄能电站到1997年6月总装机800MW 全部投产发电。十三陵抽水蓄能电站位于北京十三陵风景区,下池为十三陵水库,上池结构为钢筋混凝土面板堆石坝,贮水455万 m~3。地下厂房尺寸(长×宽×高)145×23×46.6m,4台单机容量为200MW 的单级混流可逆式水泵水轮机组,水道采用双系统布置,每一水道连两台水轮机,整个水道长2×1.6km(包括引水和尾水隧洞),直径5.2~3.7m,尾水隧洞采用针梁模板施工。十三陵工程施工洞室累计长度12km,工程土石方明挖468
At present, China’s second largest pumped storage power station - Shisanling pumped storage power station to June 1997 total installed capacity of 800MW all put into operation. The Shisanling Pumped Storage Power Station is located in the Ming Tombs Scenic Area in Beijing. The lower pool is the Ming Tombs Reservoir. The upper pool structure is a reinforced concrete face rockfill dam with a water storage capacity of 4.55 million m 3. Underground plant dimensions (L × W × H) 145 × 23 × 46.6m, 4 single stage reversible pump turbines with a single unit capacity of 200MW, with double system layout, with two turbines per channel and long waterways 2 × 1.6km (including diversion and tailrace tunnels) with a diameter of 5.2 ~ 3.7m. The tailrace tunnel is constructed with a needle-beam formwork. The total length of the tunnel construction of the Ming Tombs project 12km, engineering earthwork digging 468