论文部分内容阅读
简述了水口水电厂机组顶盖排水控制系统改造的必要性,介绍了系统改造方案,指出了系统调试的注意事项,提出了系统改进建议。
The necessity of rebuilding the roof drainage control system of Shuikou Hydropower Plant is briefly introduced. The system reformation plan is introduced, the precautions of system commissioning are pointed out, and the suggestions of system improvement are put forward.