论文部分内容阅读
本文首先介绍了国家“十一五”规划对企业节能减排的规定,然后分析了城郊选煤厂在推行2007年度节能减排项目前所存在的问题,最后介绍了各个节能项目对解决各个问题采取的措施和取得的成果。
This paper first introduces the national “Eleventh Five-Year Plan” on energy-saving emission reduction regulations, and then analyzes the suburban coal preparation plant in the implementation of energy-saving emission reduction projects in 2007 before the problems, and finally introduced the various energy-saving projects to solve Measures taken by each issue and achievements made.