论文部分内容阅读
文章从发展趋势、特点、设计方案、效益比较等方面论述了110k V装配式多层布置钢结构变电站试点的思路构想。装配式钢结构变电站将改变传统变电站的施工模式,能有效减少施工现场的工作量,缩短工程建设周期,降低人工成本,降低管理难度和复杂性,减少对资源的占用和对环境的影响,实现项目全生命周期内功能匹配、寿命协调及费用平衡。该试点工程的建成投运将会为促进和提升佛山坚强型智能电网的建设水平作出积极贡献,其实践经验将为今后推动新材料和新技术在变电站建设中的应用积累宝贵经验。
This paper discusses the concept of pilot project of 110k V assembled multi-story steel structure substation from the aspects of development trend, characteristics, design scheme and benefit comparison. Assembled steel structure substation will change the traditional substation construction mode, which can effectively reduce the workload of the construction site, shorten the construction period, reduce labor costs, reduce the management difficulty and complexity, reduce the resource occupation and impact on the environment, to achieve Project life cycle matching, life coordination and cost balance. The completion and operation of the pilot project will make a positive contribution to the promotion and promotion of the construction of Foshan’s strong smart grid. Its practical experience will accumulate valuable experience in promoting the application of new materials and new technologies in substation construction in the future.