论文部分内容阅读
介绍深基坑工程内塔式起重机基础的设置,通过钢格柱逆作法施工的应用,将塔式起重机安装在深基坑内,并提出了施工要点和注意事项,有效地控制了塔式起重机设置施工的成本,并确保了工程的施工进度。
The foundation of tower crane in deep foundation pit project is introduced. The tower crane is installed in the deep foundation pit through the application of the steel bar column reverse construction. The construction points and precautions are put forward, and the tower crane control The cost of construction, and to ensure the construction progress of the project.