Comparative results of corneal curvature measurements with three different keratometers after radial

来源 :中华医学杂志(英文版) | 被引量 : 0次 | 上传用户:wenshengfang1985
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Background Ceal curvatures measured by conventional instruments after refractive surgeries were greater than the real values.This study on the instruments and methods for measuring ceal curvature was carried out with the aim of determining an accurate,simple and effective method to evaluate ceal refractive power after radial keratotomy (RK).Methods A retrospective study was carried out on 52 eyes of 42 patients with a history of RK.The postoperative measurements after RK were performed with a manual keratometer (Rodenstock,Munchen-Hamburg,Germany),a ceal topographer (Tomey TMS-1) and an automated IOLMaster keratometer (Carl Zeiss GmbH,USA).The results obtained from analyzing clinical histories (clinical history method,CHM) were compared to the postoperative measurements with a two-way analysis of variance.Adjusted keratometry was used to correct the ceal central refractive power (K) values of the three keratometers.The CHM results were also compared to the corrected K values obtained with the three keratometers using the same statistical method.Results The smallest mean value was found for the CHM ((36.61±9.23) diopters).The K values obtained with the CHM were very different from the results obtained with the three different instruments.The corrected K values obtained with the IOLMaster were the closest to the K values from the CHM.Conclusions It was shown that K values from measurements with the three instruments were higher.When the power of the intraocular lens of the patients after RK was calculated,the errors of the K values measured with the instruments should be taken into consideration.
其他文献
0 概述我厂现有1台Ф2.4×10m两仓水泥磨,配有Ф2m旋风式选粉机一台,主要生产P.O42.5等级水泥,综合电耗达41kWh/t.自1997年投产以来,选粉效率低,台时产量仅19t左右,比表面积
Background Previous investigations have demonstrated a relatively low incidence of stroke among young women,though both pregnancy and delivery can substantiall
以2×660 MW发电项目磨煤机基础为例,介绍了大型设备基础的施工工艺,并从测量放线、钢筋安装、冷却管设置、模板搭设、预埋件安装、大体积混凝土浇筑等方面,阐述了具体的施工
我厂1#立窑成球盘原设计主轴传动方式采用的是圆柱齿轮传动,减速机为JZQ系列,电动机、减速机均固定在倾斜的底座上,减速机高速轴伸出端在下侧,长时间运行后,唇形橡胶密封圈极
期刊
Background Many studies have indicated that hyperpolarizing cardioplegia is responsible for myocardial preservation and researchers have suggested that the aden