由于钢球质量关系,我厂的磨矿作业很不正常,投产至今,没有坚持合理装球工作。生产中磨机的钢球补加失调,一次性补加5—10吨钢球的情况很多,平时第一段磨矿仅补加φ20毫米一种球径,第二段补加φ80毫米一种球径,导致磨矿细度达不到技术要求,球磨机小时处理能力低。1987年,我们加强球磨机的合理装球工作后,各项技术经济指标获得了令人满意的结果。. (一)提高球磨机小时处理能力与磨矿效率生产结果证实(见表1、2),球磨机的补加球各段补加三种球径比补加一种球径每小时处理量提高3—4吨。磨机利用系数(-200目)提高0.088—0.24吨/米~3·时,最终磨矿细度-200目含量提高3%,班操作细度合格率(技术条件合格班数)提高38—60%。(二)补加球直径及比例补加球比例是按照
Due to the quality of the ball, I plant grinding operation is not normal, put into operation so far, did not insist on a reasonable ball installation work. Production of steel ball mill additional imbalance, one-time supplement of 5-10 tons of steel balls in many cases, usually the first paragraph of grinding only add a diameter of φ20 mm, the second paragraph of additional φ80 mm a Ball diameter, resulting in grinding fineness of less than technical requirements, ball mill hour handling capacity is low. In 1987, after we strengthened the reasonable ball-loading work of the ball mill, all the technical and economic indicators have achieved satisfactory results. (A) to improve the ball mill hour processing capacity and grinding efficiency Production results confirmed (see Table 1, 2), the ball mill additional paragraphs of the ball additional three kinds of ball diameter than an additional one hour increase in diameter handling capacity of 3 -4 tons. Mill utilization factor (-200 mesh) increased 0.088-0.24 tons / m ~ 3 ·, the final grinding fineness -200 mesh content increased by 3%, class operating fineness pass rate (qualified technical conditions) to improve 38- 60%. (B) fill the ball diameter and proportion of additional ball ratio is in accordance with