摘要:在经济的基础下,城市不断发展,居住在城市的众人对住房条件的舒适度、扩展性、科技配置和节能性提出了更高的要求。有关总包部门和有关专业管理领导要加强现场施工管理,找出空调施工阶段问题出现的因素,积极加强管理加以避免或及时改正,为缩短施工工期,本文突出强调分析和深入讨论了暖通空调安装施工中存在的问题及应对办法。
关键词:暖通;空调安装施工;问题;处理方法
Abstract: Based on the economy, the city continues to develop, and people living in the city have put forward higher requirements for the comfort, scalability, technological configuration and energy saving of housing conditions. Relevant general contracting departments and relevant professional management leaders should strengthen on-site construction management, find out the factors that occur in the air conditioning construction stage, and actively strengthen management to avoid or correct them in time. In order to shorten the construction period, this article highlights the analysis and in-depth discussion of HVAC Problems existing in installation and construction and countermeasures.
Keywords: HVAC; air conditioning installation and construction; problems; solutions
引言
隨着建筑技术的发展和社会生活水平的提高,暖通空调的安装施工是建筑技术中不可缺少的一部分,但受诸多因素的影响,一直存在着质量问题。安装质量问题的发生不仅影响了暖通空调的性能,而且降低了暖通空调的安全性,不利于延长设备的使用寿命。因此施工人员应促进专业素质的提高,改进安装施工,严格按操作规程施工,避免失误,为提高建筑质量创造条件。
一、对暖通空调的解释
暖通空调是现时代经济发展社会进步和使用的重要的部件之一。随着经济的迅猛发展,建筑行业也进入了快速发展的高潮期。暖通空调作为工程项目的不可或缺环节,随着建造水平和工艺的发展,为了立足社会,暖通空调作为建筑业的核心产业出现了一个主流方向,其暖通空调产品上市,系统更新、技术革新不断涌现。暖通空调领域的发展主要是一个节约能源、低碳环保和健康可持续更新的过程[1],在保证用户前边景观环境的同时,也对安全无污染提出了要求。暖通空调在使用过程中,集供热、空气流通、调节等功能于一体,体现了科技的稳健发展,也提高了大多数居民的生活质量,比普通空调更舒适、更健康、更环保。
二、问题总结
(一)管道线路设计问题
管道线路设计是开工前的一项重要基础工作。目前存在着管线设计质量不高的问题,反映在管线与设备的交叉处,及管线与设备定位不合理等方面。暖通空调设计通常基于计算机绘图。设计人员在绘制设计图纸前,必须先拟定增加线路和设备的初步方案,然后对方案进行审查和复核。但是,由于缺乏专业精神、责任心和安全意识,很多设计人员对管线不进行检查,导致管线失效,导线在高度和定位上存在很多交叉问题,影响了施工质量,给安装带来困难。
(二)噪音问题
噪声超标是暖通空调安装施工中常见的质量问题。在制造商遵守制定的标准制造下,还是有不少大型空调出现噪音问题。在特定的环境中,测得的噪声级往往高于厂家提供的样品参数,这就造成了大风量空调系统的噪声。
(三)水循环问题
水系统非常重要,因为如果水系统发生故障,它将不利于整个系统的正常按规律运转。最常见的水循环难题是:集中空调制冷系统。造成中央空调制冷系统流通出现障碍的主要原因是:在安装过程中,管线走向出现重合点,施工不规范,导致管线网络不能正常运转;暖通空调本身的水管管道擦拭不整洁,直接导致管道淤积,导致水系统不能正常运转[2]。
(四)结露滴水问题
空调安装后经常会出现结露和滴水现象,由于在早期的装配规划设计中没有考虑和有效解决系统保温问题,在施工中管道与管道、管道与设备的连接中未全面考虑,连接处存在缝隙;在安装暖通空调时,由于施工的实际工作环境,没有按照相应的顺序进行;为了节约成本或遵循业主的要求,一些公司没有注意自己的要求是否科学合理,他们不按规定选择不合理的设备,也不在安装前进行测试,直接安装材料;暖风空调的结露和滴水的检测应在安装后进行,但这一步在实际安装中经常会不执行,导致结露滴水。
三、解决方案
(一)管线线路的设计
管线线路情况的正确设计是有效施工工程的首要原则。专业设计工作者应深入分析客户的具体情况,结合初步方案图,根据各自的安装因素去选管线,实施有效的设计方案。以满足管道应用的需要和产品施工过程的实现性。暖通空调通风管道横切面对天花板的影响很大,风管截面的高度、高度和风向决定了天花板的高度。为减少长时间引风对管网的影响,应按有关规则进行线路引导,避免出现问题。因此,有必要利用专业技术铺设管道,进行科学安排,减少占地面积。专业设计工作者应加强与技术工作者的沟通,在相互合作下保证安装施工质量水准。一个好的总体规划编制就是对所有的管线进行统一的布置和精准调度,为其线路具体位置的制定提供科学的规划和规划。在特定项目中,如果规划的管道路网和位置不合适或与其他项目发生矛盾,则应与相关单位讨论,对规划进行适当调整或协调,以确保优化管道供给[3]。 (二)噪声处理
针对暖通空调系统的噪音过大,根据多年的实践经验,解决这一问题可参考的方法是:采用具有弹性的钩连接风机,管道与风机的连接采用软接通,在空气流通位置,连接入口或在风管的适当部分安装消声器等[4]。尽可能做到风管固定件采用橡胶减振器缓冲垫,以确保风管不会振动并产生声波。还有常见的方法是在顶墙和四周墙壁安装具有良好吸收音质功能的吸音板,以尽量减少出现的噪音对建筑内生活产生不利影响[5]。
(三)水循环堵塞解决
在局部项目工艺安装完成后,要及时对管线内的废弃零物,比如焊丝表面、锈蚀等进行处理,防止这些物质淤积管道,引起水循环不畅,同时在每根独立的管线最低点都要设置排污阀,定期进行排污[6]。在整体安装完成后,要进行试压处理,保证系统整体压力在规定的时间内不发生降低,提高系统的稳定性[7-8]。
(四)水系统疏通
要确保使用的暖通空调质量,把控材料。在安装施工时也要对进行测漏检查,在空气能够顺利流通地情况下才可以开始施工。除此之外,施工人员也要采取保护措施,加强对所有裸露物质的检查。
四、结束语
综上所述,由于大量交接点导致建筑暖通技术是一项复杂的系统工程。如果一个交接点发生错误,总体质量就会受到影响,这就是为什么在施工过程中,我们需要了解和掌握建筑的核心技术,并采取对应的行动进一步控制建筑的质量,从而在一定程度上提高建筑的整体质量的原因。
参考文献:
[1]侯新岩.暖通空调安装施工过程中的问题与解决方法[J].名城绘,2020,000(001):P.1-1.
[2]孙业华,孙小路.暖通空调安装施工过程中的问题与解决方法[J].门窗,2020(2):9-10.
[3]崔刚,陈葛飞,秦义超.暖通空调系统施工安装问题与解决方法[J].工程建设与设计,2020,No.429(07):211-213.
[4]郑真.试论医院暖通空调安装施工过程中的问题与解决方法[J]. 四川建材.2017(04).
[5]林涛.暖通空调安装施工过程中的问题分析[J]. 中国住宅设施.2020(09).
[6]孙建军.暖通空调安装施工过程中的问题与解决方法[J]. 四川水泥.2015(05).
[7]刘浩,高玉梁.浅析暖通空调的安装施工[J]. 科技创新与应用.2014(03).
[8]梁豪.浅析暖通空調安装施工过程中的问题与解决方法[J]. 民营科技.2017(04).
(作者单位:无锡市硕放建筑安装工程有限公司)
关键词:暖通;空调安装施工;问题;处理方法
Abstract: Based on the economy, the city continues to develop, and people living in the city have put forward higher requirements for the comfort, scalability, technological configuration and energy saving of housing conditions. Relevant general contracting departments and relevant professional management leaders should strengthen on-site construction management, find out the factors that occur in the air conditioning construction stage, and actively strengthen management to avoid or correct them in time. In order to shorten the construction period, this article highlights the analysis and in-depth discussion of HVAC Problems existing in installation and construction and countermeasures.
Keywords: HVAC; air conditioning installation and construction; problems; solutions
引言
隨着建筑技术的发展和社会生活水平的提高,暖通空调的安装施工是建筑技术中不可缺少的一部分,但受诸多因素的影响,一直存在着质量问题。安装质量问题的发生不仅影响了暖通空调的性能,而且降低了暖通空调的安全性,不利于延长设备的使用寿命。因此施工人员应促进专业素质的提高,改进安装施工,严格按操作规程施工,避免失误,为提高建筑质量创造条件。
一、对暖通空调的解释
暖通空调是现时代经济发展社会进步和使用的重要的部件之一。随着经济的迅猛发展,建筑行业也进入了快速发展的高潮期。暖通空调作为工程项目的不可或缺环节,随着建造水平和工艺的发展,为了立足社会,暖通空调作为建筑业的核心产业出现了一个主流方向,其暖通空调产品上市,系统更新、技术革新不断涌现。暖通空调领域的发展主要是一个节约能源、低碳环保和健康可持续更新的过程[1],在保证用户前边景观环境的同时,也对安全无污染提出了要求。暖通空调在使用过程中,集供热、空气流通、调节等功能于一体,体现了科技的稳健发展,也提高了大多数居民的生活质量,比普通空调更舒适、更健康、更环保。
二、问题总结
(一)管道线路设计问题
管道线路设计是开工前的一项重要基础工作。目前存在着管线设计质量不高的问题,反映在管线与设备的交叉处,及管线与设备定位不合理等方面。暖通空调设计通常基于计算机绘图。设计人员在绘制设计图纸前,必须先拟定增加线路和设备的初步方案,然后对方案进行审查和复核。但是,由于缺乏专业精神、责任心和安全意识,很多设计人员对管线不进行检查,导致管线失效,导线在高度和定位上存在很多交叉问题,影响了施工质量,给安装带来困难。
(二)噪音问题
噪声超标是暖通空调安装施工中常见的质量问题。在制造商遵守制定的标准制造下,还是有不少大型空调出现噪音问题。在特定的环境中,测得的噪声级往往高于厂家提供的样品参数,这就造成了大风量空调系统的噪声。
(三)水循环问题
水系统非常重要,因为如果水系统发生故障,它将不利于整个系统的正常按规律运转。最常见的水循环难题是:集中空调制冷系统。造成中央空调制冷系统流通出现障碍的主要原因是:在安装过程中,管线走向出现重合点,施工不规范,导致管线网络不能正常运转;暖通空调本身的水管管道擦拭不整洁,直接导致管道淤积,导致水系统不能正常运转[2]。
(四)结露滴水问题
空调安装后经常会出现结露和滴水现象,由于在早期的装配规划设计中没有考虑和有效解决系统保温问题,在施工中管道与管道、管道与设备的连接中未全面考虑,连接处存在缝隙;在安装暖通空调时,由于施工的实际工作环境,没有按照相应的顺序进行;为了节约成本或遵循业主的要求,一些公司没有注意自己的要求是否科学合理,他们不按规定选择不合理的设备,也不在安装前进行测试,直接安装材料;暖风空调的结露和滴水的检测应在安装后进行,但这一步在实际安装中经常会不执行,导致结露滴水。
三、解决方案
(一)管线线路的设计
管线线路情况的正确设计是有效施工工程的首要原则。专业设计工作者应深入分析客户的具体情况,结合初步方案图,根据各自的安装因素去选管线,实施有效的设计方案。以满足管道应用的需要和产品施工过程的实现性。暖通空调通风管道横切面对天花板的影响很大,风管截面的高度、高度和风向决定了天花板的高度。为减少长时间引风对管网的影响,应按有关规则进行线路引导,避免出现问题。因此,有必要利用专业技术铺设管道,进行科学安排,减少占地面积。专业设计工作者应加强与技术工作者的沟通,在相互合作下保证安装施工质量水准。一个好的总体规划编制就是对所有的管线进行统一的布置和精准调度,为其线路具体位置的制定提供科学的规划和规划。在特定项目中,如果规划的管道路网和位置不合适或与其他项目发生矛盾,则应与相关单位讨论,对规划进行适当调整或协调,以确保优化管道供给[3]。 (二)噪声处理
针对暖通空调系统的噪音过大,根据多年的实践经验,解决这一问题可参考的方法是:采用具有弹性的钩连接风机,管道与风机的连接采用软接通,在空气流通位置,连接入口或在风管的适当部分安装消声器等[4]。尽可能做到风管固定件采用橡胶减振器缓冲垫,以确保风管不会振动并产生声波。还有常见的方法是在顶墙和四周墙壁安装具有良好吸收音质功能的吸音板,以尽量减少出现的噪音对建筑内生活产生不利影响[5]。
(三)水循环堵塞解决
在局部项目工艺安装完成后,要及时对管线内的废弃零物,比如焊丝表面、锈蚀等进行处理,防止这些物质淤积管道,引起水循环不畅,同时在每根独立的管线最低点都要设置排污阀,定期进行排污[6]。在整体安装完成后,要进行试压处理,保证系统整体压力在规定的时间内不发生降低,提高系统的稳定性[7-8]。
(四)水系统疏通
要确保使用的暖通空调质量,把控材料。在安装施工时也要对进行测漏检查,在空气能够顺利流通地情况下才可以开始施工。除此之外,施工人员也要采取保护措施,加强对所有裸露物质的检查。
四、结束语
综上所述,由于大量交接点导致建筑暖通技术是一项复杂的系统工程。如果一个交接点发生错误,总体质量就会受到影响,这就是为什么在施工过程中,我们需要了解和掌握建筑的核心技术,并采取对应的行动进一步控制建筑的质量,从而在一定程度上提高建筑的整体质量的原因。
参考文献:
[1]侯新岩.暖通空调安装施工过程中的问题与解决方法[J].名城绘,2020,000(001):P.1-1.
[2]孙业华,孙小路.暖通空调安装施工过程中的问题与解决方法[J].门窗,2020(2):9-10.
[3]崔刚,陈葛飞,秦义超.暖通空调系统施工安装问题与解决方法[J].工程建设与设计,2020,No.429(07):211-213.
[4]郑真.试论医院暖通空调安装施工过程中的问题与解决方法[J]. 四川建材.2017(04).
[5]林涛.暖通空调安装施工过程中的问题分析[J]. 中国住宅设施.2020(09).
[6]孙建军.暖通空调安装施工过程中的问题与解决方法[J]. 四川水泥.2015(05).
[7]刘浩,高玉梁.浅析暖通空调的安装施工[J]. 科技创新与应用.2014(03).
[8]梁豪.浅析暖通空調安装施工过程中的问题与解决方法[J]. 民营科技.2017(04).
(作者单位:无锡市硕放建筑安装工程有限公司)