跃进电站位于彭泽县马垱公社长江南岸圩区,地处太泊湖湖滨,湖区集雨面积达685平方公里。上太泊湖已经围垦,下太泊湖为蓄水区,排水渠道经跃进大队流入长江,渠尾建跃进闸一座,以防长江在高水位期江水倒灌。为了解决该大队的用电问题,1978年经有关部门的仔细勘测,认为可利用太泊湖在向长江自流排水时期建一座小型水电站,可装机40千瓦。该工程于1978年冬开工,1979年5月发电,现将该电站有关情况简述如下:
Yuejin Power Station is located in Pengze County Mantan commune polder on the southern bank of the Yangtze River, is located in Tai Po Lake Lakeside, rain catchment area of 685 square kilometers. Taipu Lake has been reclaimed too, under the Tai Po Lake water storage area, the drainage channel into the Yangtze River by the leap forward, the tail canal leap into a gate to prevent the Yangtze River in the high water level intrusion. In order to solve the problem of electricity consumption by the brigade, a careful survey by the relevant departments in 1978 indicated that Taipo Lake could be used to build a small hydropower station during the draining of the Yangtze River itself, with a capacity of 40 kilowatts installed. The project started in the winter of 1978, power generation in May 1979, the relevant conditions of the power plant are summarized as follows: