论文部分内容阅读
建筑工地临时用电的安全是高速度、高质量施工的重要条件,为保障施工现场用电安全、防止触电及电气火灾事故的发生,必须正确编制建筑工地临时用电施工组织设计。笔者就针对建筑工地临时用电组织设计的编制步骤、内容及有关计算方法作一阐述,并对相关安全用电技术措施实施提出解决办法,与同行探讨,以期提高施工用电安全防护水平。适用范围:施工现场临时用电设备在5台及以上或设备总容量在50KW以上者。
The temporary electricity safety of construction sites is an important condition for high-speed and high-quality construction. In order to ensure the safety of construction site electricity use and prevent the occurrence of electric shock and electrical fire accidents, the construction design of temporary electricity construction site must be properly compiled. The author of the construction site for the temporary electricity organization design compilation steps, content and related calculation methods for an elaboration, and the relevant safety measures for the implementation of technical measures to solve, and colleagues to explore, in order to improve the level of construction electricity safety. Scope: Temporary electricity equipment at the construction site in 5 or more or equipment total capacity of 50KW or more.