【德国《原子经济》1990年第10期报道】根据原民德国家核安全和辐射防护局(SAAS)的报告,莫尔斯莱本最终贮存库的空穴体积约为500万米~3。该贮存库拟按阶段最终贮存放射性废物。第一施工阶段的地下洞
According to the report of the former National Institute of Nuclear Safety and Radiation Protection (SAAS) of the People’s Republic of Germany, the volume of cavities in the final Morse- Lebanese repository is about 5 million meters-3. The depot intends to finalize radioactive waste in stages. Underground cave in the first construction phase