【摘 要】工程量清单计价是建设部近几年来进行工程造价计价方式改革所着力推行的方式,其目的是为了使建筑产品的价格真正由市场竞争形成,创造一个公开、公平、公正的市场竞争环境,完善我国的招投标制度。但是,由于这项改革牵涉的面较广,有些问题还相当复杂,仍然有不少问题急需解决。本文从人员管理、复核、信用机制的建立等方面论述了完善工程量清单计价方式的几点建议。
【关键词】工程量清单报价;业务素质;复核;信用和担保机制
Discussing the bill of quantities
Ma Jie
(Handan Construction Engineering Group Co., Ltd Handan Hebei 056001)
【Abstract】The bill of quantities is the Ministry of Construction in recent years the Engineering Cost focus on the implementation of the reform, its purpose is to real market competition, the price of building products to create an open, fair, and fair market competition environment, improveof the bidding system. However, since this reform involves broad, some of the problems are quite complex, there are still many problems need to be resolved. This article discusses the perfect BOQ pricing Suggestions from personnel management, review, and the establishment of the credit mechanism.
【Key words】BOQ;Professional quality;Review;Credit guarantee mechanism
工程量清单报价是国际上普遍采用的工程招投标方式,已有上百年历史,规章制度完善成熟。在我国,工程量清单报价是一种全新的计价模式,与过去几十年来一直沿用的定额加费用计价办法相比,有着完全不同的内容。以国家标准发布实施的《建设工程工程量清单计价规范》,是面向我国工程建设市场,运用市场定价机制,改革工程造价管理,逐步建立由政府宏观调控、市场有序竞争形成工程造价的新机制。建设工程计价方式的改革,标志着我国工程造价管理发生了由传统“量价合一”的计划模式向“量价分离”的市场模式的重大转变。
1. 加强编制人员的素质管理
工程量清单计价法是工程计价一种新的方法,随着改革深入,这种办法越显示出科学性与重要性,要使我们跟上发展,加强与提高预算队伍素质管理已迫在眉睫。
首先,应加强预算人员的职业道德教育。让预算人员懂得投标报价在很大程度上决定中标后的施工行为,合理造价是企业的生命。因此,预算人员应严格按有关规定结合企业实际情况编制工程报价,防止无限压价、哄抬造价、相互串标、围标行为,查处预算员证书满天飞,私自承接预算编制任务,以及其他损害业主、国家利益的现象,以保障工程量清单健康有序的实施。
其次,应加强预算人员的业务素质教育。定期对预算员进行合同管理、设计规范、施工技术、预算基本知识、微机应用等各方面的培训,并且严格把关考核发证,实行持证上岗与证书年审制度,对取得证书而无从事预算工作及预算工作质量低劣的人员,应收回其资格证书,以净化预算队伍。具休地讲,在工程量计算时,要求编审人员做到:
(1)准备资料,熟悉施工图纸。施工图纸是了解设计意图和工程全貌,从而准确计算工程量的基础资料,只有对施工图纸有较全面而详细的了解,才能结合统一项目划分正确地分析该工程中各分部分项工程,才能有地计算其工程量。要充分了解施工组织设计和施工方案,如土方工程中的余土外运或借土回填及深基础的施工方法。必要时需深入现场实地观察,以补充有关资料的不足。例如土方工程的土囊类别及现场场地情况等,以做便确定清单项目是考虑人工还是机械,如若需机械挖土,则机械又将如何配备等。
(2)熟悉工程量计算规则,准确计算工程量。工程量计算需要花费较长时间,工作繁重,但是工程量作为工程量清单报价的主要依据,准确与否直接影响到整个招投标工作的顺利进行。因此作为造价从业人员,必须在工程量计算上狠下功夫,才能保证清单的质量,严格按统一的工程量计算规则计算要实施工程的全部工程量。
(3)按统一的计量单位列出工程量清单报价表,同时分项工程的名称、规格必须与现行的计价依据所列的内容一致。
2. 认真进行全面复核,确保清单内容符合实际科学合理
清单准确与否,关系到工程投资的控制。此清单编制完成后应认真进行全面复核。可采用如下方法:
(1)技术经济指标复核法。
将编制好的清单进行套定额计价从工程造价指标,主要材料消耗量指标,主要工程量指标等方面与同类建筑工程进行比较分析。在复核时,或要选择与此工程具有相同或相似结构类型、建筑形式、装修标准、层数等的以往工程,将上述几种技术经济指标逐一比较,如果出入不大,可判定清单基本正确,如果出人较大则肯定其中必有问题。那就按图纸在各分部中查找原因。用技术经济指标可从宏观上判断清单是否大致准确。
(2)利用相关工程量之间的关系复核,如:外墙装饰面积=外墙面积-外墙门窗面积;内墙装饰面积=外墙面积+内墙面积×2-(外门窗十内闪窗面积×2);地面面积+楼地面面积=天棚面积;平屋面面积=建筑面积偶数。 (3)仔细阅读建筑说明,结构说明及各节点详图从中可以发现一些疏忽和遗漏的项目,及时补足。核对清单定额子目名称是否与设计相同,表达是否明确清楚,有无错漏项。
3. 推行工程量清单需要建立信用和担保机制
(1)工程量清单计价招标需要借鉴国际通行做法建立信用和担保机制,基本建设工程担保包括投标担保、承包人履约担保和发包人支付担保。发包人支付担保和承包人履约担保采用保证方式,保证人对其出具的保函应当承担连带责任。工程担保的保证人应当是在中华人民共和国境内注册的银行、保险公司或专业担保公司。工程担保的投保费用应当计入工程成本,发包人投标担保和承包人履约担保的投保费用应当纳入投标报价参与竞争。
(2)采取保证方式进行担保的,其投标人投标保函、承包人履约保函和发包人支付保函应当见索即付,即保证人无需介入对被保证人违约事实的认定,只要权利人在保函的有效期内,保函规定的索赔程序向保证人出示相应的索赔文件,保证人应当立即无条件地就担保金额向权利人支付索赔款项。
4. 对推行工程量清单计价方式中可能出现的问题,进行深入的研究
(1)应当对承包商的市场竞争行为进行研究,搞清楚正当竞争行为与不正当竞争行为的区别,防治不正当竞争行为及其危害。不平衡报价是企业在市场经济条件下常用的竞争策略,只有搞清楚在什么情况下是正当的,什么情况下是有害的,才有可能防止商包商滥用这个权力。为了有效地保护双方的合法利益,不平衡报价要不要遵循一个准则,或者说要不要有一个合理的限度,如果需要的话,这个准则或者合理的限度如何设定?如果不制定这个准则或者合理的限度,需要采取哪些措施来防治可能出现的弊端?价格竞争是市场经济条件下企业竞争永恒的主题。
(2)对合同价格的调整方法进行深入研究。实行工程量清单计价以后,企业不再把全国统一(地区、专业统一)的定额作为计价基础,工程合同价格调整以中标价为准的内涵将发生变化。
(3)对一些措施项目的计价办法需要进行研究。现行的定额中留了很多的活口,这些多年存在的活口大多涉及施工措施,由于工程实际千差万别、技术措施灵活多样、施工方法各不相同,需要因地制宜、实事求是地加以解决。
(4)对政府投资项目的管理方法加强研究。政府虽然是工程承包市场上最大的业主,但纳税人才是政府工程真正的出资人。所以,它的管理方式和效果往往是社会的热点、焦点,并且对市场起着一种导向的作用。
实行工程量清单招标的方式以后,可能引发的问题是复杂的,上面讨论的只不过是其中的一小部分,很多可能出现的问题是难以预料的,我们必须有足够的准备。
5. 结束语
工程量清单计价是建筑业发展的必然趋势,是市场经济发展的必然结果,也是适应国际国内建筑市场竞争的必然选择,它对招标投标机制的完善和发展,建立有序的建设市场公平竞争秩序都将起到非常积极的推动作用。随着工程量清单的不断推行,传统定额计价的僵化模式将逐步地被打破,但同样也不可避免地带来了许多新的问题,作为工程造价管理来讲,也将会随着情况发展而发展。因而,培育一批既懂工程技术、又懂工程经济和管理的人才是当前迫切的任务。
参考文献
[1] 戚安邦著.工程项目全面造价管理.南开大学出版社,2000.
[2] 潭得精著.工程造价确定与控制.重庆大学出版社,2001.
[3] 王玉龙著.建设工程造价问题答2000例.上海同济大学出版社,1997.
[4] 唐连钰著.工程造价的确定与控制.中国建材工业出版社,2000.
[文章编号]1619-2737(2014)09-21-921
[作者简介] 马杰,男,职称:工程师,工作单位:邯郸建工集团有限公司。
【关键词】工程量清单报价;业务素质;复核;信用和担保机制
Discussing the bill of quantities
Ma Jie
(Handan Construction Engineering Group Co., Ltd Handan Hebei 056001)
【Abstract】The bill of quantities is the Ministry of Construction in recent years the Engineering Cost focus on the implementation of the reform, its purpose is to real market competition, the price of building products to create an open, fair, and fair market competition environment, improveof the bidding system. However, since this reform involves broad, some of the problems are quite complex, there are still many problems need to be resolved. This article discusses the perfect BOQ pricing Suggestions from personnel management, review, and the establishment of the credit mechanism.
【Key words】BOQ;Professional quality;Review;Credit guarantee mechanism
工程量清单报价是国际上普遍采用的工程招投标方式,已有上百年历史,规章制度完善成熟。在我国,工程量清单报价是一种全新的计价模式,与过去几十年来一直沿用的定额加费用计价办法相比,有着完全不同的内容。以国家标准发布实施的《建设工程工程量清单计价规范》,是面向我国工程建设市场,运用市场定价机制,改革工程造价管理,逐步建立由政府宏观调控、市场有序竞争形成工程造价的新机制。建设工程计价方式的改革,标志着我国工程造价管理发生了由传统“量价合一”的计划模式向“量价分离”的市场模式的重大转变。
1. 加强编制人员的素质管理
工程量清单计价法是工程计价一种新的方法,随着改革深入,这种办法越显示出科学性与重要性,要使我们跟上发展,加强与提高预算队伍素质管理已迫在眉睫。
首先,应加强预算人员的职业道德教育。让预算人员懂得投标报价在很大程度上决定中标后的施工行为,合理造价是企业的生命。因此,预算人员应严格按有关规定结合企业实际情况编制工程报价,防止无限压价、哄抬造价、相互串标、围标行为,查处预算员证书满天飞,私自承接预算编制任务,以及其他损害业主、国家利益的现象,以保障工程量清单健康有序的实施。
其次,应加强预算人员的业务素质教育。定期对预算员进行合同管理、设计规范、施工技术、预算基本知识、微机应用等各方面的培训,并且严格把关考核发证,实行持证上岗与证书年审制度,对取得证书而无从事预算工作及预算工作质量低劣的人员,应收回其资格证书,以净化预算队伍。具休地讲,在工程量计算时,要求编审人员做到:
(1)准备资料,熟悉施工图纸。施工图纸是了解设计意图和工程全貌,从而准确计算工程量的基础资料,只有对施工图纸有较全面而详细的了解,才能结合统一项目划分正确地分析该工程中各分部分项工程,才能有地计算其工程量。要充分了解施工组织设计和施工方案,如土方工程中的余土外运或借土回填及深基础的施工方法。必要时需深入现场实地观察,以补充有关资料的不足。例如土方工程的土囊类别及现场场地情况等,以做便确定清单项目是考虑人工还是机械,如若需机械挖土,则机械又将如何配备等。
(2)熟悉工程量计算规则,准确计算工程量。工程量计算需要花费较长时间,工作繁重,但是工程量作为工程量清单报价的主要依据,准确与否直接影响到整个招投标工作的顺利进行。因此作为造价从业人员,必须在工程量计算上狠下功夫,才能保证清单的质量,严格按统一的工程量计算规则计算要实施工程的全部工程量。
(3)按统一的计量单位列出工程量清单报价表,同时分项工程的名称、规格必须与现行的计价依据所列的内容一致。
2. 认真进行全面复核,确保清单内容符合实际科学合理
清单准确与否,关系到工程投资的控制。此清单编制完成后应认真进行全面复核。可采用如下方法:
(1)技术经济指标复核法。
将编制好的清单进行套定额计价从工程造价指标,主要材料消耗量指标,主要工程量指标等方面与同类建筑工程进行比较分析。在复核时,或要选择与此工程具有相同或相似结构类型、建筑形式、装修标准、层数等的以往工程,将上述几种技术经济指标逐一比较,如果出入不大,可判定清单基本正确,如果出人较大则肯定其中必有问题。那就按图纸在各分部中查找原因。用技术经济指标可从宏观上判断清单是否大致准确。
(2)利用相关工程量之间的关系复核,如:外墙装饰面积=外墙面积-外墙门窗面积;内墙装饰面积=外墙面积+内墙面积×2-(外门窗十内闪窗面积×2);地面面积+楼地面面积=天棚面积;平屋面面积=建筑面积偶数。 (3)仔细阅读建筑说明,结构说明及各节点详图从中可以发现一些疏忽和遗漏的项目,及时补足。核对清单定额子目名称是否与设计相同,表达是否明确清楚,有无错漏项。
3. 推行工程量清单需要建立信用和担保机制
(1)工程量清单计价招标需要借鉴国际通行做法建立信用和担保机制,基本建设工程担保包括投标担保、承包人履约担保和发包人支付担保。发包人支付担保和承包人履约担保采用保证方式,保证人对其出具的保函应当承担连带责任。工程担保的保证人应当是在中华人民共和国境内注册的银行、保险公司或专业担保公司。工程担保的投保费用应当计入工程成本,发包人投标担保和承包人履约担保的投保费用应当纳入投标报价参与竞争。
(2)采取保证方式进行担保的,其投标人投标保函、承包人履约保函和发包人支付保函应当见索即付,即保证人无需介入对被保证人违约事实的认定,只要权利人在保函的有效期内,保函规定的索赔程序向保证人出示相应的索赔文件,保证人应当立即无条件地就担保金额向权利人支付索赔款项。
4. 对推行工程量清单计价方式中可能出现的问题,进行深入的研究
(1)应当对承包商的市场竞争行为进行研究,搞清楚正当竞争行为与不正当竞争行为的区别,防治不正当竞争行为及其危害。不平衡报价是企业在市场经济条件下常用的竞争策略,只有搞清楚在什么情况下是正当的,什么情况下是有害的,才有可能防止商包商滥用这个权力。为了有效地保护双方的合法利益,不平衡报价要不要遵循一个准则,或者说要不要有一个合理的限度,如果需要的话,这个准则或者合理的限度如何设定?如果不制定这个准则或者合理的限度,需要采取哪些措施来防治可能出现的弊端?价格竞争是市场经济条件下企业竞争永恒的主题。
(2)对合同价格的调整方法进行深入研究。实行工程量清单计价以后,企业不再把全国统一(地区、专业统一)的定额作为计价基础,工程合同价格调整以中标价为准的内涵将发生变化。
(3)对一些措施项目的计价办法需要进行研究。现行的定额中留了很多的活口,这些多年存在的活口大多涉及施工措施,由于工程实际千差万别、技术措施灵活多样、施工方法各不相同,需要因地制宜、实事求是地加以解决。
(4)对政府投资项目的管理方法加强研究。政府虽然是工程承包市场上最大的业主,但纳税人才是政府工程真正的出资人。所以,它的管理方式和效果往往是社会的热点、焦点,并且对市场起着一种导向的作用。
实行工程量清单招标的方式以后,可能引发的问题是复杂的,上面讨论的只不过是其中的一小部分,很多可能出现的问题是难以预料的,我们必须有足够的准备。
5. 结束语
工程量清单计价是建筑业发展的必然趋势,是市场经济发展的必然结果,也是适应国际国内建筑市场竞争的必然选择,它对招标投标机制的完善和发展,建立有序的建设市场公平竞争秩序都将起到非常积极的推动作用。随着工程量清单的不断推行,传统定额计价的僵化模式将逐步地被打破,但同样也不可避免地带来了许多新的问题,作为工程造价管理来讲,也将会随着情况发展而发展。因而,培育一批既懂工程技术、又懂工程经济和管理的人才是当前迫切的任务。
参考文献
[1] 戚安邦著.工程项目全面造价管理.南开大学出版社,2000.
[2] 潭得精著.工程造价确定与控制.重庆大学出版社,2001.
[3] 王玉龙著.建设工程造价问题答2000例.上海同济大学出版社,1997.
[4] 唐连钰著.工程造价的确定与控制.中国建材工业出版社,2000.
[文章编号]1619-2737(2014)09-21-921
[作者简介] 马杰,男,职称:工程师,工作单位:邯郸建工集团有限公司。