论文部分内容阅读
从近年来我国电力持续负荷统计来看,全国95%以上的高峰负荷年累计持续时间只有几十个小时,采用增加调峰发电装机的方法来满足这部分高峰负荷,显然很不经济。如果能在夏(冬)季用电高峰时段削减或转移一定量的用电负荷,那么就可以提高发电机组、变电站及电力线路的利用率,提高电力系统运行的经济性,降低电力生产成本,减缓发输变电等电网增量设备的增速,以利节
From the statistics of continuous load of power in our country in recent years, the cumulative peak load of over 95% of the whole country lasts only a few dozen hours. It is obviously uneconomical to adopt the method of increasing peak load to meet the peak load. If you can cut down or transfer a certain amount of electricity load during peak summer (winter) season, then you can improve the utilization of generating units, substations and power lines to improve the economy of the power system operation and reduce the cost of electricity production, Slow down the transmission and distribution grid and other incremental growth equipment, Eli Jie