论文部分内容阅读
广州总体规划是按功能分区,尽可能从合理布局来控制和调整岸线使用。近年来已分别规划了港口的港区岸线,仓库运输用的岸线,作为船厂与船舶基地或工业区的岸线,以及按排轮渡码义、建材码头等。此外,还对游泳场、珠江大桥及将来新桥两旁的控制(大桥两旁一船控制100~200米作为桥头绿化、战时抢修的场地),也均作了规定。按照这个原则,根据使用岸线单位的要求,由我局核定岸线。
Guangzhou overall plan is divided according to function, as far as possible from the rational layout to control and adjust shoreline use. In recent years, the port coastline and the shoreline for warehousing and transport have been separately planned as the shoreline of the shipyard, the shipping base or the industrial zone, and the code ferry yueyi and the building material wharf. In addition, the control of the swimming pool, the Pearl River Bridge and the future bridge (both sides of a bridge control 100 to 200 meters as a green bridge site, repair sites during the war) are also provided. In accordance with this principle, according to the requirements of shoreline units, approved by the Board of shoreline.