论文部分内容阅读
针对人工配线法求取水文地质参数费时费力,而传统的计算机配线法存在操作不够简便、后台运算次数过多或缺少直观性的不足,该文基于配线法标准曲线与实测曲线基本重合的特点,采用控制点带动所有实测点沿标准曲线移动,寻找离差平方和最小值的优化路径法求到水文地质参数,提出该方法的关键在于控制点的确定,并补充手动配线法来保证计算的准确性。通过算例验证,新方法在满足精度要求的同时,大大提高了运算的速度,具有一定的应用前景。
It is time-consuming and labor-consuming to calculate the hydro-geological parameters by manual wiring method. However, the traditional computer wiring method is not easy enough to operate, too many background operations or lack of intuitive. Based on the wiring standard curve and the measured curve basically coincide , The control points are used to drive all the measured points along the standard curve to find the optimal path method for finding the minimum and the square of the deviations to obtain the hydrogeological parameters. The key point of this method is to determine the control points and supplement the manual wiring method Ensure the accuracy of the calculation. Through the example verification, the new method not only meets the precision requirements, but also greatly increases the speed of the computation and has certain application prospect.