论文部分内容阅读
1978年南非金铀矿U_3O_8的生产由于新厂的投产而稳定地增加。这一年的头九个月U_3O_8的总产量达到3330.5公吨,比1977年同期的产量(2784.5
The production of U_3O_8 gold uranium in South Africa steadily increased in 1978 due to the new plant. In the first nine months of the year, the total production of U_3O_8 reached 3330.5 metric tons, which was higher than the output of the same period in 1977 (2784.5