论文部分内容阅读
我省国营、地方国营厂矿一至九月份大部完成或超额完成国家计划,比之去年已有不小进步,但存在问题仍是严重的,而产品的质量低,成本高又是比较普遍的现象。如太原造纸厂打字纸抗水度不够;大同矿务局混煤中含灰份超过中央规定;富家滩南关煤含坩过多;山西化学厂电池电压不足经常跑电;太原线材厂铅丝镀锌不均、易断,洋钉钉身不正且混入废品;杏花村汾酒发苦、竹叶青沉淀混浊;清徐露酒、太原酒厂黄酒亦有变质情况。这样就引起了群众的不满,影响销售部门的销售,影响到工厂的正常生产,造成积压,给国家造成了重大的损失。如太原线材厂洋钉内混入铁末和废品,出售后顾主反映意见很多,甚至提出退货,今年上半年共积压线材五八三吨,山西机器厂暖气炉片质量低,成本高上半年结存六○、○○○片;太原化学厂电木制品灯口、闸盒等因质量过低,天津交电公司提出撤销原订包销合同,不予收货,在上半
Most of the state-owned and local state-owned factories and mines in the province completed or exceeded the national plan from January to September, which is not a small improvement over last year. However, the problems are still serious. The low quality of products and high costs are common phenomena. . For example, Taiyuan Paper Mill’s typing paper has insufficient water resistance; Datong Coal Mining Bureau’s mixed coal contains more ash than the Central Regulations; Fujiatan Nanguan Coal contains too much thorium; Shanxi Chemical Plant has insufficient battery voltage to run electricity regularly; Taiyuan Wire Factory has lead wire plating. Uneven zinc, easy to break, foreign nails are not correct and mixed into the waste; apricot Huajiu wine bitter, Zhuyeqing precipitation turbidity; Qing Xu Lu wine, winery in Taiyuan winery is also deteriorating. This has caused the dissatisfaction of the masses, affected the sales of the sales department, affected the normal production of the factory, caused a backlog, and caused major losses to the country. Such as Taiyuan wire factory studs mixed with iron powder and waste products, after the sale reflects the views of many owners, and even proposed a return, the first half of this year, a total of 583 tons of wire rods accumulated, Shanxi Machine Factory heating furnace chip quality is low, the high cost of the first half of the balance of six ○, ○○○ pieces; Taiyuan Chemical Factory Bakelite products, lamp boxes, brake boxes, etc. due to the low quality, Tianjin Jiaotong Electric Company proposed to cancel the original underwriting contract, not to receive goods, in the first half