【摘 要】随着技术的进步和人们生活质量的提升,对于建筑整体质量的要求越来越高。管线综合布置技术就是强调对于各个分体管道建设施工的总体协调,避免各个分体管道施工的盲目进行,造成工程的整体浪费,拖延建设工期,通过管线综合布置技术就可以站在科学发展的角度实现建筑施工全面协调发展。管线综合布置技术促进了建筑物的功能化发展,提高了建筑物的现代化发展,给施工方提供技术支撑保障。
【关键词】高层建筑;综合管线;施工; 管理
Explore integrated pipeline technology in the construction of high-rise buildings
Xu Hong-xing
(Pingdingshan Shenma Construction Engineering Group Co., Ltd. Department of Civil Engineering Pingdingshan Henan 467000)
【Abstract】With the progress and quality of life improvement in technology, the overall quality of construction have become increasingly demanding. Pipeline technology is integrated layout emphasizes the overall coordination of the various split pipeline construction project, to avoid blindly each split pipeline construction, resulting in a waste of the whole project, delaying the construction period, arranged through line technology can be integrated perspective of scientific development achieve comprehensive and coordinated development of construction. Pipeline layout technology for integrated development of the function of the building, to improve the modernization of the building, to provide technical support to the construction side protection.
【Key words】High-rise buildings;Integrated pipeline;Construction;Management
随着科学技术的不断发展,我国的高层建筑越来越多,高层建筑涵盖多种专业技术,施工技术、质量及管理要求标准高,“四新”技术应用多。在给排水、电气、空调暖通等各设备专业设计人员中普遍存在配合协调不足,经常造成管道标高交叉严重,管道定位互相挤占空间等现象。再加上施工过程中受现场情况、施工顺序、设计人员不在现场等因素的影响,不可避免地会造成很多的返工、延缓施工进度、增加施工成本、影响美观,甚至会影响建筑物正常使用的严重后果。这就要求我们工程人员在施工前必须进行综合管线深化设计,综合考虑各专业的设备和管线布置,以实现设计施工综合效益最大化的目标。
本文将结合工程施工中管线综合技术的应用对高层建筑综合管线施工中应注意的问题和施工管理方面展开分析。
1. 管线综合技术工艺实施
在进行高层建筑管线综合布置施工前一定要按照规定的流程执行,首先进行相关技术的准备,其次组织相关施工方等对图纸进行会审,整理出施工电子版图纸,进而制作出机电安装管线综合平衡图,之后组织各方对综合平面图讨论及会审最后进行图纸的绘制与报请甲方及设计院审核,审核通过之后正式施工。
2. 综合管线施工操作要点
以往,有的工程由于未做管线综合布置,工地上出现了个别分包抢先施工,使后施工的工种无法进行施工的被动现象,以至于不得不进行重复劳动:装上去再拆下来,拆下来再装上去。结果浪费了材料,拖延了工期,影响了质量。怎样解决这些问题,要靠管线综合。有了管线综合图,建设单位更利于正确决策,施工单位更方便组织施工,监理单位更易于三大控制,使用单位更便于维修管理。因此,管线综合在高层及超高层工程中具有特殊的作用。
2.1 技术准备。
组织相关技术人员对图纸进行审计核,施工方要积极地与管道建设方进行图纸会审,充分尊重管道施工方的意见,及时的针对他们提出的问题进行研究与审核。
2.2 整理施工图纸电子版。
在进行管道综合布置施工前要整理图纸的电子版,针对会审中发现的问题要及时调整电子版施工图,对于不必要的备注说明以及设计尺寸等要进行删除,同时对于各个单独管道施工电子版进行总体整合与汇总,形成完整的电子版图纸。
2.3 各专业修改优化、专业图纸。
2.3.1 规范标注。由于图纸是对各个单独管道施工图纸设计的综合汇总,由于他们所属的行业不同,他们设计的表达方式也就不同,因此他们在图纸上的标注形式也就不一样,比如:消防和给排水管标高表示的是管中心标高,电缆桥架标注的是下底相对该层地面的标高。设备专业地下部分采用绝对标高,地上部分是以各层地面为参考点的相对标高,而电气专业全部以本楼层地面为参考点,标注的是相对楼层地面的桥架下底标高。因此为了实现管线的综合布置,有必要规范图纸的标注,首先统一管线高度、宽度等尺寸规定以及采用值等。其次改变图纸标注的方式,比如考虑水管的外径尺寸、风管的厚度、桥架的高度、风管和空调水管保温层的厚度,将一点式标注改为两点式,通过一系列的改变可以对综合图纸进行快速的了解,实现管线综合布置技术的发展。 2.3.2 对图纸进行优化修改时应该按照原来的管道设计尺寸进行修改,不得改变管道施工尺寸的基本原则,可以说只有在不违背基本原则的情况对图纸可以进行优化修改,同时对于修改的内容要进行登记,并且在图纸上对于不同的管道施工要进行颜色标注,以便施工方一眼就能了解其施工设计。
2.4 制作机电安装管线综合平衡图。
2.4.1 各机电安装专业修改图纸后,对完成的初稿进行自审,其间要注意垂直管线位置,出到平面的标高与位置。
2.4.2 在绘制综合平面图前要与查看施工现场的具体状况依照现场实际情况确定标高及平面位置。
2.4.3 各机电安装专业图纸和建筑结构图纸梁、板、柱尺寸核对,无论何种管线均不得撞梁、穿梁,否则,则调整管线标高,使之在建筑结构允许的空间内进行。
2.5 绘制节点详图。
2.5.1 利用计算CAD绘图软件将各专业电子图纸按照不同专业不同层的方法进行叠加,形成管线布置综合平衡平面图。
2.5.2 在绘制管线布置综合平衡图时,要结合各专业技术人员的意见,对其进行合理化的讨论,发现问题并加以整改。
2.5.3 合并各专业图纸后由项目技术负责人绘制剖面图及节点详图。
2.6 综合平面图的讨论及会审。
2.6.1 图纸在绘制完成之后要交由多部门进行集中讨论,对于讨论的结果要进行记录,并且讨论的结果作为评定图纸的最后依据。
2.6.2 在讨论中如果出现不同意见要根据合理的意见进行图纸的重新绘制。
3. 人员的配备与要求
3.1 具有全面相关知识能力的人员配置2名,负责总体的管线安装调度。
3.2 具体管道施工人员1~2名,技术管理人员1~2名。
3.3 全面管道技术人员与具体管道技术人员之间、管道安装人员与建筑施工人员要具有协调合作能力,并且各方人员要具有相应使用计算机知识的水平能力,尤其是对于绘图软件的使用。
3.4 建筑工程各方要建立完善的沟通体系,施工方要及时与设计单位建立联系,获取设计的意图,并且与甲方、监理等进行沟通,了解建筑施工需要进行的管道安排,以此为综合管线设计布局提供基础条件。
3.5 做好各项操作过程的记录。在该工艺的整个流程中应同步记录每一次修改的原因、具体内容、修改结果等详细信息,它便于专业间的及时相互了解,在每次一个专业的调整后其他相关专业能及时准确做出对应的修改;由于整个过程是一个反复修改、讨论的过程,不同专业的同一位置可能会重复修改多次,通过记录可以有效避免由于不同版本图纸的混淆,比较每次修改的效果,记录中还应体现建设单位不同阶段的具体要求、目的以及施工过程中每次提出的其他要求。
4. 管线综合注意事项
4.1 凡是原标高位置不动即可,施工者一律不改,只对非动不可的管线进行调整。
4.2 对于管道在施工中需要调整的,要依照其原则进行调整,而不能为了调整而破坏其功能性。
4.3 对于进行管道的重新设计与调整要本着有利于安装、管理的目的,方便以后的维修等。
4.4 全面关注影响管线综合的各类因素,除建筑结构及管线本身尺寸外,还要考虑到保温层厚度,施工维修所需要的间隙,吊架角钢、吊顶龙骨所占空间,以及有关设备如吊柜空调机组和吊顶内灯具,装修造型等各种有关因素。
5. 结束语
新时期发展进程中,我国城市化建设的不乏也逐渐加快,高层建筑工程的施工质量将直接不仅关系到未来建筑工程的功能正常使用,其也将间接地关系到了未来建筑工程使用人员的人生与财产安全。因此,对于高层建筑施工企业而言,保持比较良好的建筑施工管理工作确保是建筑施工企业产生效益的根本所在。超高层建筑的综合管线设计关系到建筑日后使用的功能性与安全性,是企业确保建筑质量的重点。
参考文献
[1] 郭敏锋.新世界时代科贸中心超高层建筑前期设计研究[D].华南理工大学,2012.
[2] 李小康.典型超高层建筑风效应及风振控制[D].汕头大学,2010.
[3] 孙大明,田慧峰,周志仁.绿色超高层建筑设计的重点与难点探讨[A].2011:5.
【关键词】高层建筑;综合管线;施工; 管理
Explore integrated pipeline technology in the construction of high-rise buildings
Xu Hong-xing
(Pingdingshan Shenma Construction Engineering Group Co., Ltd. Department of Civil Engineering Pingdingshan Henan 467000)
【Abstract】With the progress and quality of life improvement in technology, the overall quality of construction have become increasingly demanding. Pipeline technology is integrated layout emphasizes the overall coordination of the various split pipeline construction project, to avoid blindly each split pipeline construction, resulting in a waste of the whole project, delaying the construction period, arranged through line technology can be integrated perspective of scientific development achieve comprehensive and coordinated development of construction. Pipeline layout technology for integrated development of the function of the building, to improve the modernization of the building, to provide technical support to the construction side protection.
【Key words】High-rise buildings;Integrated pipeline;Construction;Management
随着科学技术的不断发展,我国的高层建筑越来越多,高层建筑涵盖多种专业技术,施工技术、质量及管理要求标准高,“四新”技术应用多。在给排水、电气、空调暖通等各设备专业设计人员中普遍存在配合协调不足,经常造成管道标高交叉严重,管道定位互相挤占空间等现象。再加上施工过程中受现场情况、施工顺序、设计人员不在现场等因素的影响,不可避免地会造成很多的返工、延缓施工进度、增加施工成本、影响美观,甚至会影响建筑物正常使用的严重后果。这就要求我们工程人员在施工前必须进行综合管线深化设计,综合考虑各专业的设备和管线布置,以实现设计施工综合效益最大化的目标。
本文将结合工程施工中管线综合技术的应用对高层建筑综合管线施工中应注意的问题和施工管理方面展开分析。
1. 管线综合技术工艺实施
在进行高层建筑管线综合布置施工前一定要按照规定的流程执行,首先进行相关技术的准备,其次组织相关施工方等对图纸进行会审,整理出施工电子版图纸,进而制作出机电安装管线综合平衡图,之后组织各方对综合平面图讨论及会审最后进行图纸的绘制与报请甲方及设计院审核,审核通过之后正式施工。
2. 综合管线施工操作要点
以往,有的工程由于未做管线综合布置,工地上出现了个别分包抢先施工,使后施工的工种无法进行施工的被动现象,以至于不得不进行重复劳动:装上去再拆下来,拆下来再装上去。结果浪费了材料,拖延了工期,影响了质量。怎样解决这些问题,要靠管线综合。有了管线综合图,建设单位更利于正确决策,施工单位更方便组织施工,监理单位更易于三大控制,使用单位更便于维修管理。因此,管线综合在高层及超高层工程中具有特殊的作用。
2.1 技术准备。
组织相关技术人员对图纸进行审计核,施工方要积极地与管道建设方进行图纸会审,充分尊重管道施工方的意见,及时的针对他们提出的问题进行研究与审核。
2.2 整理施工图纸电子版。
在进行管道综合布置施工前要整理图纸的电子版,针对会审中发现的问题要及时调整电子版施工图,对于不必要的备注说明以及设计尺寸等要进行删除,同时对于各个单独管道施工电子版进行总体整合与汇总,形成完整的电子版图纸。
2.3 各专业修改优化、专业图纸。
2.3.1 规范标注。由于图纸是对各个单独管道施工图纸设计的综合汇总,由于他们所属的行业不同,他们设计的表达方式也就不同,因此他们在图纸上的标注形式也就不一样,比如:消防和给排水管标高表示的是管中心标高,电缆桥架标注的是下底相对该层地面的标高。设备专业地下部分采用绝对标高,地上部分是以各层地面为参考点的相对标高,而电气专业全部以本楼层地面为参考点,标注的是相对楼层地面的桥架下底标高。因此为了实现管线的综合布置,有必要规范图纸的标注,首先统一管线高度、宽度等尺寸规定以及采用值等。其次改变图纸标注的方式,比如考虑水管的外径尺寸、风管的厚度、桥架的高度、风管和空调水管保温层的厚度,将一点式标注改为两点式,通过一系列的改变可以对综合图纸进行快速的了解,实现管线综合布置技术的发展。 2.3.2 对图纸进行优化修改时应该按照原来的管道设计尺寸进行修改,不得改变管道施工尺寸的基本原则,可以说只有在不违背基本原则的情况对图纸可以进行优化修改,同时对于修改的内容要进行登记,并且在图纸上对于不同的管道施工要进行颜色标注,以便施工方一眼就能了解其施工设计。
2.4 制作机电安装管线综合平衡图。
2.4.1 各机电安装专业修改图纸后,对完成的初稿进行自审,其间要注意垂直管线位置,出到平面的标高与位置。
2.4.2 在绘制综合平面图前要与查看施工现场的具体状况依照现场实际情况确定标高及平面位置。
2.4.3 各机电安装专业图纸和建筑结构图纸梁、板、柱尺寸核对,无论何种管线均不得撞梁、穿梁,否则,则调整管线标高,使之在建筑结构允许的空间内进行。
2.5 绘制节点详图。
2.5.1 利用计算CAD绘图软件将各专业电子图纸按照不同专业不同层的方法进行叠加,形成管线布置综合平衡平面图。
2.5.2 在绘制管线布置综合平衡图时,要结合各专业技术人员的意见,对其进行合理化的讨论,发现问题并加以整改。
2.5.3 合并各专业图纸后由项目技术负责人绘制剖面图及节点详图。
2.6 综合平面图的讨论及会审。
2.6.1 图纸在绘制完成之后要交由多部门进行集中讨论,对于讨论的结果要进行记录,并且讨论的结果作为评定图纸的最后依据。
2.6.2 在讨论中如果出现不同意见要根据合理的意见进行图纸的重新绘制。
3. 人员的配备与要求
3.1 具有全面相关知识能力的人员配置2名,负责总体的管线安装调度。
3.2 具体管道施工人员1~2名,技术管理人员1~2名。
3.3 全面管道技术人员与具体管道技术人员之间、管道安装人员与建筑施工人员要具有协调合作能力,并且各方人员要具有相应使用计算机知识的水平能力,尤其是对于绘图软件的使用。
3.4 建筑工程各方要建立完善的沟通体系,施工方要及时与设计单位建立联系,获取设计的意图,并且与甲方、监理等进行沟通,了解建筑施工需要进行的管道安排,以此为综合管线设计布局提供基础条件。
3.5 做好各项操作过程的记录。在该工艺的整个流程中应同步记录每一次修改的原因、具体内容、修改结果等详细信息,它便于专业间的及时相互了解,在每次一个专业的调整后其他相关专业能及时准确做出对应的修改;由于整个过程是一个反复修改、讨论的过程,不同专业的同一位置可能会重复修改多次,通过记录可以有效避免由于不同版本图纸的混淆,比较每次修改的效果,记录中还应体现建设单位不同阶段的具体要求、目的以及施工过程中每次提出的其他要求。
4. 管线综合注意事项
4.1 凡是原标高位置不动即可,施工者一律不改,只对非动不可的管线进行调整。
4.2 对于管道在施工中需要调整的,要依照其原则进行调整,而不能为了调整而破坏其功能性。
4.3 对于进行管道的重新设计与调整要本着有利于安装、管理的目的,方便以后的维修等。
4.4 全面关注影响管线综合的各类因素,除建筑结构及管线本身尺寸外,还要考虑到保温层厚度,施工维修所需要的间隙,吊架角钢、吊顶龙骨所占空间,以及有关设备如吊柜空调机组和吊顶内灯具,装修造型等各种有关因素。
5. 结束语
新时期发展进程中,我国城市化建设的不乏也逐渐加快,高层建筑工程的施工质量将直接不仅关系到未来建筑工程的功能正常使用,其也将间接地关系到了未来建筑工程使用人员的人生与财产安全。因此,对于高层建筑施工企业而言,保持比较良好的建筑施工管理工作确保是建筑施工企业产生效益的根本所在。超高层建筑的综合管线设计关系到建筑日后使用的功能性与安全性,是企业确保建筑质量的重点。
参考文献
[1] 郭敏锋.新世界时代科贸中心超高层建筑前期设计研究[D].华南理工大学,2012.
[2] 李小康.典型超高层建筑风效应及风振控制[D].汕头大学,2010.
[3] 孙大明,田慧峰,周志仁.绿色超高层建筑设计的重点与难点探讨[A].2011:5.