论文部分内容阅读
复杂地质条件下隧道施工技术是一个系统问题,随着我国经济的发展,各地在面对复杂地质隧道施工方面都有着自己的时和方法,系统性的排水排气安排,弱质岩层变形量和抗压强度的估计,以及和用围建筑物的干扰等问题都逐渐被施工技术工作者所面对并攻破,相应的我们应时复杂地质条件下隧道施工的技术也越来越成熟,这将极大的推动我国经济发展过程中涉及的铁路建设工程,对国家发展做贡献。
Tunnel construction technology under complex geological conditions is a systematic problem. With the development of economy in our country, all localities have their own time and methods in the face of complex geological tunnel construction. Systematic drainage and exhaust arrangements, deformation of weak rock formations and Compressive strength of the assessment, and the interference with the surrounding buildings and other issues are gradually being faced by construction workers and technical breakthroughs, corresponding to our timely and complex geological conditions of tunnel construction technology is more and more mature, which will Greatly promote the railway construction projects involved in the economic development in our country and make contributions to the development of the country.