济钢的水系统主要通过能源动力厂下属4个供水和处理车间(供水车间、环水车间、板坯水处理车间和综合水处理车间)实现对全厂水资源的分配和处理,各供水车间的大部分泵站已逐步实现PLC控制,个别泵站仍然就地操作。由于现有系统不仅无法实现全厂水系统全过程的监控,更不能发挥在优
Jigang’s water system mainly distributes and processes water resources of the whole plant through four water supply and treatment workshops (water supply workshop, water ring workshop, slab water treatment workshop and integrated water treatment workshop) under the power plant, and each water supply workshop Most of the pumping stations have been gradually realized PLC control, individual pumping stations are still in operation. Due to the existing system can not only realize the whole process monitoring of the entire plant water system, but also can not play in the excellent