A method for computing unsupported roof distance in roadway advancement and its in-situ application

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:lym66688
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month. A reasonable unsupported roof distance (URD) ​​when advancing underground coal mine roadways contribute significantly to safe and rapid roadway development. A mechanical model of the roof, using the relationship between the roof stress distribution and URD, obtained by the difference method, and roof stability according to the in-situ roof stress and rock mass strength was developed. We later designed a proper range of URD, developed a testing method of URD with the function of mining protection, as roof stability through analyzing the test data and then determined a reasonable URD. Consumption of the factors of the geological conditions, the immediate roof stability and the efficiency of the labor arrangement system, the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method. results show that, when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway adv ancement of 6 m per cycle, the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.
其他文献
The permeability evolution of rock during the progressive failure process is described.In combination with the strength degradation index,the degradation formul
期刊
为解决传统富水性评价中遇到的水文地质试验孔较少,不能有效反映含水层富水性区划以及影响因素的不确定性问题,应用沉积控水规律,构建含有砂泥质量比、卵砾石层厚度、卵砾石
技术管理是建筑工程施工企业管理工作的重点,也是保障建筑施工企业从施工到验收整个过程顺利进行的重要环节,建筑工程施工中的技术管理水准影响着整个工程施工水平的高低.本
期刊
人类社会进入21世纪以来,正在经历一场革命性的变化,信息和信息技术革命,正以前所未有的方式对经济社会起着巨大的催变作用,信息技术取消了时间和距离的概念,加速了全球化的
为什么我们需要下调营养摄入量rnWhy we need to adjust the nutrients intake amount to lowerrnH.Saito(Tokyo University Hospital,Tokyo,Jarpan)
The rocks surrounding a roadway exhibit some special and complex phenomena with increasing depth of excavation in underground engineering.Quasi-static analysis
期刊
化工设备的安装质量是整个化工安装工程的关键因素,而现代化工设备的安装施工技术比较复杂,每道安装工序都需要进行系统科学的规划部署,掌握每一项施工技术.本文就阐述了如何
我们需要怎样的办公空间?回答这个问题,也许需要很多个关键词,比如采光,比如布局,又比如舒适度……而所有这些都可以归结为一个词:人性化。无论是工作在写字楼里,还是工作在独立的院
期刊