混合P2P网络中固定节点延迟修复策略的性能分析

来源 :小型微型计算机系统 | 被引量 : 0次 | 上传用户:oicui
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着移动网络的普及与移动业务的增多,传统网络中的P2P技术开始向移动P2P发展,产生了固定节点和移动节点并存的混合P2P网络.在混合P2P网络的环境下,基于固定节点的延迟修复策略,结合用户请求数、在线移动节点数、在线固定节点数及处于修复状态的固定节点数,建立四维连续时间Markov链模型.利用矩阵几何解方法,进行系统模型的稳态分析,给出系统失效率及数据平均访问时间等性能指标的表达式.通过数值实验定量刻画固定节点个数对系统性能的影响. With the popularization of mobile networks and the increase of mobile services, the P2P technology in the traditional networks has started to move towards P2P, resulting in a hybrid P2P network in which fixed nodes and mobile nodes coexist.In the environment of hybrid P2P networks, the delay based on fixed nodes Repair strategy, the four-dimensional continuous-time Markov chain model is established by combining the number of user requests, the number of mobile nodes, the number of online fixed nodes and the number of fixed nodes in the repaired state, and the steady state analysis of the system model is given by using the matrix geometric solution method System failure rate and average data access time, etc. The numerical experiment quantitatively describes the influence of the number of fixed nodes on the system performance.
其他文献
在博弈论的基础上建立一种自我激励的信用系统模型.该模型将整个P2P系统构造成为一个虚拟参与人,让虚拟参与人和普通节点为了自身的最优利益进行博弈,由此得出一个可以满足系
期刊
期刊
在建筑行业中,建筑施工技术和施工工艺的创新在客观上对能源使用的节约化和高效化提出了更高的要求,对于建筑单位来说,在现代建筑工程施工中采用节能技术,减少资源的浪费具有
期刊
富贵竹又称绿叶仙达龙血树 ,是百合科龙血树属常绿小乔木。富贵竹切花栽培近几年才开始 ,市场前景较好。1 生物学及生态学特性富贵竹原产西非及刚果等地。茎高 2m ,细长直立
建筑项目施工管理是直接关系到建筑工程施工最后效果的关键因素之一,因此本文分析了加强建筑工程项目施工管理的措施.
为了有效的降低公路隧道施工过程中产生的各项费用,需要将施工过程中出现的超挖减少,提高机械的使用效率,降低施工的材料及设备的使用成本.本文简单的叙述了公路隧道成本控制
三十年来,经济大潮中几番大浪淘沙之后,全国其他省份与广东省广有同样背景的省广基本销声匿迹,惟有广东这家依然活跃在人们视线中,并在2006年至2008年《中国广告作品年鉴》评
秘境之地-从贡格尔河到达里诺尔湖   只有在贡格尔河和达里诺尔湖,在这样一个生物多样化的综合性自然生态保护区,才能产出华子鱼这种来自大江大湖的天然美味。   草原上流