Development of a drill energy utilization index for aiding selection of drill machines in surface mi

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:yexj585
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Drill machines used in surface mines, particularly in coal, is characterized by a very poor utilization(around 40%) and low availability(around 60%). The main purpose of this study is to develop a drill selection methodology and simultaneously a performance evaluation technique based on drill cuttings produced and drilling rate achieved. In all 28 blast drilled through were investigated. The drilling was accomplished by 5 different drill machines of Ingersoll-Rand and Revathi working in coal mines of Sonepur Bazari(SECL) and Block-II(BCCL). The drills are Rotary and Rotary Percussive type using tricone rock roller bits. Drill cuttings were collected and sieve analysis was done in the laboratory. Using Rosin Ramler Diagram, coarseness index(CI), mean chip size(d), specific-surface area(SSA) and characteristic particle size distribution curves for all the holes drilled were plotted. The predictor equation for drill penetration rate established through multiple regressions was found to have a very good correlation with an index of determination of 0.85. A comparative analysis of particle size distribution curves was used to evaluate the drill efficiency. The suggested approach utilises the area under the curve, after the point of trend reversal and brittleness ratio of the respective bench to arrive at drill energy utilization index(DEUI), for mapping of drill machine to bench. The developed DEUI can aid in selecting or mapping a right machine to right bench for achieving higher penetration rate and utilizations. Drill machines used in surface mines, particularly in coal, are characterized by a very poor utilization (around 40%) and low availability (around 60%). The main purpose of this study is to develop a drill selection methodology and simultaneously a performance evaluation The technique was based on drill cuttings produced and drilling rate achieved. The drilling was accomplished by 5 different drill machines of Ingersoll-Rand and Revathi working in coal mines of Sonepur Bazari (SECL) and Block-II ( BCCL). The drills are Rotary and Rotary Percussive type using tricone rock roller bits. Drill cuttings were collected and sieve analysis was done in the laboratory. Using Rosin Ramler Diagram, coarseness index (CI), mean chip size (d), specific- surface area (SSA) and characteristic particle size distribution curves for all the holes drilled were plotted. The predictor equation for drill penetration rate established through multiple regressions was found to ha a comparative analysis of particle size distribution curves was used to evaluate the drill efficiency. The suggested approach utilises the area under the curve, after the point of trend reversal and brittleness ratio of the respective bench to arrive at drill energy utilization index (DEUI), for mapping of drill machine to bench. The developed DEUI can aid in selecting or mapping a right machine to right bench for achieving higher penetration rate and utilizations.
其他文献
近几年,通过开展施工现场安全达标、安全评价、专项安全整治等一系列的建筑安全管理活动,极大地促进了建筑安全生产形势的进一步好转。但是,不可否认的是现实工作中,工伤事故
近期,由九江钢铁自动化部联合湖南视拓公司强强联手共同合作研发的九钢中厚板PCS与MES系统集成正式投入实际应用,通过信息化手段巧妙地使上层管理信息与底层控制信息连成一体
期刊
在国内,随着EPC工程总承包逐步成为建筑市场发展一种的趋势,如何在激烈的市场竞争中获得优势,促进企业稳定、健康的发展,是由承包企业所面临的主要问题。EPC工程总承包是指承包商
2008年,中国地板行业已跨入系统竞争时代。记者曾在一篇文章中戏称中国地板行业遭遇“十面埋伏”:原材料紧张、国家宏观调控、出口退税降低、人民币升值、水电煤运价格攀升、
投资控制贯穿于项目建设的全过程,分为项目决策、项目设计、项目招投标、项目施工、项目竣工结算五个阶段的造价控制。项目竣工结算阶段是工程实际造价的最终形成阶段 Inves
期刊
“长效”是开放建筑的核心目标之一,而“填充”系统则是促成建筑物能够具有长效质量的关键技术之一.一个好的填充系统是建立在好的接口系统上.设计或发明一个好的接口系统,需
施工企业开展质量管理自查与评价的目的是为了进一步验证和评估企业各部门科室和项目部实施质量管理的情况,不断完善质量管理体系的适宜性、有效性和充分性,提升质量管理能力
一、课题的由来rn传统墙体材料比如多孔砖、空心砌块等,自重大,对地基承载力要求高,有湿作业;剪力墙结构钢筋模板用量大,工人的劳动强度高.因此传统墙体无法满足墙改的需要,
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥