论文部分内容阅读
齐鲁石化公司乙烯工程是我国的特大型重点工程,以年产三十万吨乙烯装置和年产二十万吨烧碱装置为中心,总共拥有以国外引进为主、国内配套为辅的十六套生产装置。全部建成投产后,每年可生产48万吨塑料、8万吨橡胶、60万吨各种化工原料。为了迅速发挥投资效益,必须高速度、高水平地完成建厂任务。当前,基本建设战线正在改革管理体制,推行投资包干制和招标承包制,因此控制质量就显得更为重要。提高工程质量,要贯彻“百年大计,质量第一”的方针。在土建工程、安装工程分部分项工程质量检查、隐蔽工程验收及中间交接检查、试车投产、竣工验收等建设全过程中,必须依靠群众,加强全面质量控制。土建工程的质量控制是乙烯工程全面质量控制的重要组成部分。土建工程质量的好坏与勘察设计的质量有关,与供应的设备材料质量有关,与施工的质量有关,与质量管理有关
Qilu Petrochemical Company ethylene project is a large-scale key projects in our country, with an annual output of 300,000 tons of ethylene plant and an annual output of 200,000 tons of caustic soda plant as the center, with a total of foreign-introduced, supplemented by domestic support of 16 sets Production equipment. After all are put into operation, it can produce 480,000 tons of plastic, 80,000 tons of rubber and 600,000 tons of various chemical raw materials each year. In order to bring the investment benefits into full play, it is necessary to complete the construction of the plant at a high speed and at a high level. At present, the basic construction front is in the process of reforming the management system and implementing the investment package system and the tendering contract system. Therefore, the quality control is even more important. To improve the quality of the project, we must implement the policy of “a hundred years plan, quality first”. In the whole process of construction of civil engineering, installation and sub-project quality inspection, concealed project acceptance and intermediate handover inspection, commissioning and commissioning, completion acceptance, etc., we must rely on the masses and strengthen overall quality control. The quality control of civil engineering is an important part of total quality control of ethylene project. The quality of civil engineering and survey and design of the quality of the quality and supply of equipment and materials related to the quality and construction related to quality management