论文部分内容阅读
华能浙江玉环电厂百万千瓦级超超临界燃煤发电机组主机设备合同签字仪式不久前在北京举行。这一合同的签订 ,标志着我国电力工业技术装备水平和制造能力进入了新的发展阶段。国务院副总理曾培炎出席了签字仪式。华能浙江玉环电厂地处瓯江口 ,乐清湾东岸 ,为港口电站 ,由中国华
Huaneng Zhejiang Yuhuan Power Plant million-kilowatt-class ultra-supercritical coal-fired generating units host equipment contract signing ceremony not long ago in Beijing. The signing of this contract marks that the level of China’s power industry technology and equipment and manufacturing capabilities have entered a new stage of development. Vice Premier Zeng Peiyan attended the signing ceremony. Huaneng Zhejiang Yuhuan Power Plant is located in Oujiangkou, east of Yueqing Bay, a port power station,